Project Title Description Type Theme Total Project Value ($'000)
Fitness Equipment at John Knight Park
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Open space fitness equipment upgrades to John Knight Park, Belconnen, Tuggeranong Park and Theodore Oval project. New Works Active Canberra – Healthy Canberra 100
Fitness Equipment at Theodore Oval
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Open space fitness equipment upgrades to John Knight Park, Belconnen, Tuggeranong Park and Theodore Oval project. New Works Active Canberra – Healthy Canberra 100
Fitness Equipment at Tuggeranong Town Park
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Open space fitness equipment upgrades to John Knight Park, Belconnen, Tuggeranong Park and Theodore Oval project. New Works Active Canberra – Healthy Canberra 100
Franklin – Community Recreation Irrigated Park Enhancement
Show Map Location
This project provides for the construction, in partnership with the Land Development Agency, of a Community Recreation Irrigated Park in Franklin. The facility will provide the local community with a high quality recreation space that will support a range of informal sport, recreation and physical activity outcomes. Work in Progress Active Canberra – Healthy Canberra 500
Grant for Development of a New Basketball Centre and Player Amenities
Show Map Location
This project continues the delivery of funding support for construction of a new facility to increase the space available for basketball competition and training in the ACT. Work in Progress Active Canberra – Healthy Canberra 3,000
Greenway Oval Upgrade
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Active Canberra – Healthy Canberra 800
Lyneham Precinct – Regional Tennis and Sports Centre – Stage 2
Show Map Location
This project continues the redevelopment of Lyneham Precinct at Southwell Park in accordance with the concept plan. Work in Progress Active Canberra – Healthy Canberra 4,000
Lyneham Precinct Redevelopment Stage 3
Show Map Location
This project continues work on the redevelopment of the Lyneham Precinct (Southwell Park) in accordance with the revised Master Plan. Work in Progress Active Canberra – Healthy Canberra 4,600
Lyneham Sports Precinct – Central Amenities (Design)
Show Map Location
This project provides for the design of central amenities at Southwell Park to support the multitude of sporting community users and attract greater recreational access. Work in Progress Active Canberra – Healthy Canberra 500
Lyneham Sports Precinct – Stage 4 tennis facility enhancement
Show Map Location
The Government will provide a grant to Tennis ACT to finalise development of the tennis facility at Lyneham. The redevelopment will include a four court indoor tennis centre and junior courts. The facilities will also support a partnership with Tennis Australia to deliver a range of additional regional and national tennis events in the ACT. New Works Active Canberra – Healthy Canberra 3,000
Lyneham Sports Precinct Development – Stage 1
Show Map Location
The project will continue to deliver significant enhancements to the Lyneham Precinct at Southwell Park. Work in Progress Active Canberra – Healthy Canberra 8,600
Manuka Oval – New Spectator Facilities and Media Infrastructure
Show Map Location
This project will increase Manuka Oval’s capacity by an additional 1,400 seats and enhance its spectator facilities and media infrastructure, which will improve its commercial viability and reduce subsidies required to host major events. Work in Progress Active Canberra – Healthy Canberra 4,056
Manuka Oval Redevelopment (Design)
Show Map Location
This project continues the design of the upgrade of Manuka Oval to enhance facilities for spectators, the media and corporate partners as part of the agreement with the AFL and Greater Western Sydney. Work in Progress Active Canberra – Healthy Canberra 1,152
Melrose Synthetic Football Facility (Design)
Show Map Location
This project provides for the design of a synthetic football facility at Melrose High School. The final design will serve both the needs of the school and football communities, providing critical infrastructure to meet growing participation levels. Work in Progress Active Canberra – Healthy Canberra 200
Motorsports Fund – Capital Improvements to Fairbairn Park (Design)
Show Map Location
This project continues the planning, design and documentation to provide for the implementation of improvements to the Fairbairn motorsports facility. Work in Progress Active Canberra – Healthy Canberra 500
Narrabundah Ballpark – Stage 2 – Design
Show Map Location
The Government will fund the detailed design for Stage 2 of the Narrabundah Ballpark upgrade. The design will include potential future works such as a new grandstand, improved retail and catering options, the realignment of the playing field and improved public access and car parking facilities. The cost of this initiative, up to a maximum of $500,000, will be met from within existing resources. New Works Active Canberra – Healthy Canberra
Netball Infrastructure Upgrades (Design)
Show Map Location
This project provides for the design of upgrades at various netball facilities across the Territory to improve safety, quality and accessibility. Work in Progress Active Canberra – Healthy Canberra 200
Restoration of Sportsgrounds – Weetangera
Show Map Location
This project is for the restoration of the neighbourhood oval in Weetangera which is being upgraded to provide the local community with high quality sporting facilities. Work in Progress Active Canberra – Healthy Canberra 1,300
Stromlo Forest Park – Enclosed Oval (Feasibility)
Show Map Location
This project provides for a feasibility study of an enclosed oval within Stromlo Forest Park to service the needs of the community and sporting groups, in particular AFL, football, rugby union and rugby league codes. Work in Progress Active Canberra – Healthy Canberra 200
Transport for Canberra – Walking and cycling infrastructure – Stage 4
Show Map Location
The Government will deliver a number of walking and cycling projects across the ACT. This builds on existing walking and cycling infrastructure programs funded in previous budgets. The works undertaken will include implementing the Strategic Cycle Network, improving path links to public transport, improving the age friendliness of suburbs and increasing cycle lanes through the reseal program and road pavement line marking changes. New Works Active Canberra – Healthy Canberra 2,500
Tuggeranong Lakeside Leisure Centre – Water play park
Show Map Location
The Government will provide $500,000 in 2015-16 for the construction of a Water Play Park at the Lakeside Leisure Centre to improve public amenity and encourage community participation in aquatic activities. Design works of $100,000 in 2014-15 will be met from within existing resources. New Works Active Canberra – Healthy Canberra 500
"Where Will We Play" Outdoor Facilities Water Reduction Strategies
Show Map Location
The project will continue with the implementation of solutions to reduce potable water consumption and secure non-potable irrigation options for a number of ACT sporting facilities, including the construction of water tanks at Inner North playing fields and the design of Woden Park Athletics Track. Work in Progress Active Canberra – Healthy Canberra 16,000

Top of page

Educated Capital

Project Title Description Type Theme Total Project Value ($'000)
Belconnen High School Modernisation – Stage 1
Show Map Location
This project provides for improvements at Belconnen High School. This project funds improvement works to six classrooms, the school front office and administration areas and the school hall. Work in Progress Educated Capital 2,000
Belconnen Region Schools – Modernisation
Show Map Location
The Government will invest in improvements to Belconnen High School and will build on the master planning work initiated in the 2013-14 Budget. Stage 1 works (funded in 2013-14 and 2014-15) include building demolition, facilities upgrades and completion of the master planning in consultation with south Belconnen public school communities. New Works Educated Capital 250
Belconnen Regional Trades Skills Centre
Show Map Location
This is a Commonwealth funded program to provide Trade Training Centres. Work In Progress Educated Capital 8,120
Canberra College Cares – New Building at Phillip Campus
Show Map Location
This project will construct a new purpose-built facility for the Canberra College Cares (CC Cares) program at the Canberra College Woden campus. The new facility will provide learning spaces and facilities to support young pregnant and parenting students and their children. Work in Progress Educated Capital 14,000
Carbon Neutral Schools – Stage 1
Show Map Location
This initiative is to support ACT public schools to move towards carbon neutrality. Work in Progress Educated Capital 3,500
Childcare Centre Upgrades – Stage 2
Show Map Location
This project provides for the refurbishment and upgrade of ACT Government owned childcare centres. Work in Progress Educated Capital 2,900
Childcare Centre Upgrades – Stage 3 – Bunyarra and Salem Children’s Centres
Show Map Location
The Government will refurbish and upgrade its childcare facilities at Bunyarra and Salem Children’s Centres to meet the National Quality Standards for Early Childhood Education and Care Services. New Works Educated Capital 1,391
CIT Campus Modernisation – Tuggeranong Campus
Show Map Location
The Government will develop a campus modernisation strategy for the Canberra Institute of Technology. The Government has included an Infrastructure Investment Provision in the Budget for developing a new CIT Campus in Tuggeranong. New Works Educated Capital
COAG Universal Access to Preschools – Stage 1 Expansion Works
Show Map Location
Stage 1 of this initiative involves upgrades and extensions at 12 existing ACT Government preschools to ensure compliance with the National Quality Framework – Physical Environment Standards. Work in Progress Educated Capital 6,200
Coombs P-6 School Construction
Show Map Location
The Government is investing a total of $47.250 million in the construction of the Coombs primary school, the first school in Molonglo. The school will be able to accommodate around 700 students from pre-school to year 6 and will open for the 2016 school year. This initiative was included by the Government in the Appropriation Act 2013-14 (No 2). Work in Progress Educated Capital 47,250
Curtin Primary School Upgrades
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Educated Capital 1,200
Disability Access Improvements – Bruce CIT
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Educated Capital 100
Disability Access Improvements – Reid CIT
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Educated Capital 260
Gilmore Primary School Upgrades
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Educated Capital 800
Holt Preschool Refurbishment
Show Map Location
This project provides for the refurbishment and upgrade of the Holt preschool with a view to establishing an early childhood centre, occasional care centre, playgroup or playschool. Work in Progress Educated Capital 500
Isabella Plains Childcare Centre – Stormwater Upgrade
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Educated Capital
Public Libraries – Computer and security upgrades – Belconnen
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Civic
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Dickson
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Erindale
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Gungahlin
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Kingston
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Kippax
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Tuggeranong
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Public Libraries – Computer and security upgrades – Woden
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Upgrade of CCTV cameras and computer stations at all public libraries including Belconnen, Civic, Dickson, Erindale, Gungahlin, Kingston, Kippax, Tuggeranong and Woden project. New Works Educated Capital 230
Tuggeranong Introductory English Centre
Show Map Location
This project provides for the establishment of a new introductory English centre at the Wanniassa Hills Primary School. The new facility will give students with limited or no English speaking background, who have recently arrived in Australia and Canberra, the opportunity for intensive language tuition before settling into a mainstream school in the Tuggeranong school network. Work in Progress Educated Capital 1,800
Upgrade of Early Childhood Facilities
Show Map Location
This program is the first stage of capital works to upgrade and expand ACT Government owned childcare centres in line with the National Quality Framework for Early Childhood Education and Care – Physical Environment Standards. Stage 1 of the program involves upgrades and extensions at nine existing early childhood centres. Work in Progress Educated Capital 7,716
Wanniassa Hills Primary School – Additional Car Parking (Bilson Place)
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Educated Capital

Top of page

Growing the Economy

Project Title Description Type Theme Total Project Value ($'000)
Australia Forum – Investment ready
Show Map Location
The Government will invest $1.5 million in 2014 15 in further progressing the Australia Forum convention centre project to an investment ready stage. This will include the development of a reference design and budget and analysis of procurement options for consideration by Government. The Government has also included an Infrastructure Investment Provision of $8 million to administer the procurement process for the convention centre. New Works Growing the Economy 1,500
Capital Metro
Show Map Location
The Government will invest in the development of Capital Metro. This includes preparing Capital Metro to an investment ready stage and, subject to the full business case, commencing the procurement and delivery of the light rail service and its operation, specialised economic and financial advisory services and stakeholder engagement activities. New Works Growing the Economy
City Plan Implementation
Show Map Location
The Government will commission studies to deliver change and growth in the city through the City Plan. These studies will include the development of transport and movement plans. New Works Growing the Economy 150
Civic to Gungahlin Corridor Improvements
Show Map Location
The Government will invest in improvements and renewal in the Civic to Gungahlin corridor. The works will improve travel and amenity in the corridor and help prepare for the Capital Metro light rail. Specific projects will include road, path, drainage and intersection works as well as alignment preparation. New Works Growing the Economy 20,000
Greenfields Planning for Affordable Housing (Feasibility)
Show Map Location
This project will allow for continued planning and infrastructure investigations in greenfields areas to support Government priorities, land supply and land release related to the provision of affordable housing. Work in Progress Growing the Economy 350
Majura Parkway Estate Development (Design)
Show Map Location
This project provides for assessment and design of infrastructure requirements to facilitate a potential commercial development in the vicinity of the Majura Parkway adjacent to the Canberra Airport commercial precinct. Work in Progress Growing the Economy 600
National Arboretum Canberra – Event terrace and precinct facilities
Show Map Location
The Government will complete the landscaping and visitor infrastructure at the event terrace at the National Arboretum Canberra which links the Visitors Centre, Margaret Whitlam Pavilion and Amphitheatre, in keeping with the Arboretum Master Plan. Works include planting trees, hedges and installing irrigation, construction of gravel and hard surfaced pedestrian and vehicular pavements, mower strips, toilets, outdoor furniture and signage, tree protection and car parking to the Margaret Whitlam Pavilion. New Works Growing the Economy 1,484

Top of page

Healthy Cities

Project Title Description Type Theme Total Project Value ($'000)
Aboriginal Torres Strait Islander Residential Alcohol and Other Drug Rehabilitation Facility
Show Map Location
This project will provide a culturally appropriate alcohol and drug residential rehabilitation facility for adult Aboriginal and Torres Strait Islander people in the ACT. The facility will provide for eight beds, with potential to expand to 16 beds as required. Work in Progress Healthy Cities 7,933
Adult Secure Mental Health Unit (Finalising Design)
Show Map Location
This project is to undertake a design brief and forward design for a 25 bed low and medium secure mental health inpatient unit. Work in Progress Healthy Cities 2,000
Calvary Hospital Car Park (Design)
Show Map Location
This project is to design a multi storey car park for up to 700 vehicles on the Calvary Hospital campus. Work in Progress Healthy Cities 1,300
Calvary Public Hospital – Car park
Show Map Location
The Government will construct a 700 space car park on the Calvary campus. This will meet current, as well as future, demand as hospital services on the campus are expanded. New Works Healthy Cities 19,080
Calvary Public Hospital – Refurbishments for more beds
Show Map Location
The Government will provide funding to Calvary Public Hospital for refurbishments to accommodate 15 additional beds. New Works Healthy Cities 1,605
Clinical Services and Inpatient Unit Design and Infrastructure Expansion
Show Map Location
This project will prepare a proof of concept and forward design for major clinical buildings at the Canberra Hospital, expansion of the Emergency Department on finalisation of proof of concept, and provision of a paediatric service in the Canberra Hospital Emergency Department. Work in Progress Healthy Cities 40,780
Clinical Services Redevelopment – Phase 2
Show Map Location
This initiative provides for the relocation of services, refurbishment of major infrastructure at the Canberra Hospital and early construction works for new facilities associated with the Health Infrastructure Program. Work in Progress Healthy Cities 8,850
Clinical Services Redevelopment – Phase 3
Show Map Location
This project will upgrade campus wide infrastructure at the Canberra Hospital such as campus ring mains, replacement of plant and equipment, and relocation of services. Work in Progress Healthy Cities 18,690
Continuity of Health Services Plan – Essential Infrastructure
Show Map Location
This program provides the design and construction (or fit-out) of a range of facilities to allow additional bed capacity to be provided across the public health system in the Territory. It also allows for implementation of new campus infrastructure, and the replacement and expansion of existing infrastructure to ensure that essential infrastructure. Work in Progress Healthy Cities 20,367
Hazardous Material Removal Program – Stage 3
Show Map Location
The Government is providing additional funding for the removal and disposal of asbestos and other hazardous substances from schools. New Works Healthy Cities 3,000
Health Infrastructure Program – Project management
Show Map Location
This program provides for the project management of the Health Infrastructure Program (HIP), including Health Directorate’s project management staff, program management fees for key consultants, advisors and agencies associated with delivery of the HIP. Work In Progress Healthy Cities 19,319
Health Infrastructure Program – Project management continuation
Show Map Location
The Government will continue funding for project management support services for the Health Infrastructure Program (HIP). The HIP involves the redevelopment and expansion of the ACT’s hospital and community based health infrastructure to meet future demand. New Works Healthy Cities 27,706
HIP Change Management and Communication Support
Show Map Location
This project will provide for a comprehensive, structured and dedicated change management and communication program to support the development and implementation of the construction program planned under the CADP. The CADP will deliver significant changes to the way health services are delivered in the ACT and these new approaches require both provider and consumer understanding and commitment. Work In Progress Healthy Cities 4,117
Linear Accelerator Procurement and Replacement
Show Map Location
This project will construct two bunkers and provide one additional linear accelerator by June 2009. A second bunker is provided to allow a fourth linear accelerator to be purchased by 2012. This will enhance radiation oncology services and assist the service in meeting increasing projected demand. Work In Progress Healthy Cities 17,250
Mental Health Young Persons Unit
Show Map Location
This initiative is for the forward design of an inpatient mental health facility, adjacent to the Calvary Hospital, which will comprise 20 beds and a secure subdivision in order to meet the needs and safety of younger clients from 13-25 years. Work in Progress Healthy Cities 775
Northside Hospital Specification and Documentation
Show Map Location
This initiative provides for the development of specifications and documentation for the proposed Northside Hospital (now the University of Canberra Public Hospital). Work in Progress Healthy Cities 4,000
Provision for Project Definition Planning
Show Map Location
The initiative allows for the undertaking of feasibility and design studies, developing implementation strategies and coordinating the delivery of all construction works in relation to The Capital Asset Development Plan (CADP). CADP provides the basis for building a sustainable and modern health system to ensure safety, availability, and viability of quality health care in the ACT to 2022. Work In Progress Healthy Cities 58,040
Secure Mental Health Unit
Show Map Location
The Government will construct a 25 bed Secure Mental Health Unit to appropriately accommodate patients with severe mental illness. New Works Healthy Cities 43,491
Staging and Decanting – Moving To Our Future
Show Map Location
A program of works is underway to relocate Health Directorate services for continuity of services during staged implementation of the Health Infrastructure Program redevelopment. Work in Progress Healthy Cities 22,300
Staging, Decanting and Continuity of Services
Show Map Location
This initiative will support the decanting and relocation of health services as new facilities are completed and other areas are refurbished to meet service growth demands for additional beds, clinics and day spaces. It also provides funding to undertake feasibility and preliminary design work for additional car parking at Calvary Hospital. Work In Progress Healthy Cities 19,430
The Canberra Hospital – Essential infrastructure and engineering works
Show Map Location
The Government will upgrade essential infrastructure including fire safety systems, lifts and electrical switchboards at Canberra Hospital, to ensure compliance and safety standards are maintained. New Works Healthy Cities 5,640
The Canberra Hospital Redevelopment
Show Map Location
The Government will undertake refurbishments at Canberra Hospital to provide additional beds and to relocate beds from other areas of the hospital. These works will ensure continuity of in-patient services while infrastructure redevelopments take place. New Works Healthy Cities 24,263
University of Canberra Public Hospital
Show Map Location
The Government will develop a new hospital on the University of Canberra campus. This will be a sub-acute facility, also encompassing teaching and research. The hospital will form part of an integrated care model with Calvary Public Hospital and Canberra Hospital. The Government has included the budget for the new facility in an Infrastructure Investment Provision. The total estimated investment is not reported at this time due to commercial sensitivities and procurement model considerations. Funding of $12.252 million has also been provided in previous budgets for specification, documentation and design of the new hospital. New Works Healthy Cities
University of Canberra Public Hospital (Design)
Show Map Location
This project will complete facility planning and forward design to final sketch plan stage for the University of Canberra Public Hospital. Work in Progress Healthy Cities 8,252

Top of page

Liveability and Opportunity

Project Title Description Type Theme Total Project Value ($'000)
A New Respite Property
Show Map Location
The Government will provide up to $1.075 million for the construction of a purpose built respite property for children, to replace an existing respite property currently operated by Disability ACT. It is expected that the government funding will be supplemented by a contribution from a private entity. New Works Liveability and Opportunity 1,075
Ainslie Music Hub
Show Map Location
This project will enable upgrades to the Ainslie Arts Centre to enhance its use as a Music Hub, with a focus on music for young people and to provide a public access community performance space. Work in Progress Liveability and Opportunity 1,500
Alexander Maconochie Centre – Additional facilities
Show Map Location
The Government is funding the construction of a new 30 cell Special Care Centre and a new 56 cell flexible accommodation block inside the existing Alexander Maconochie Centre in response to increasing detainee numbers. Funding is also being provided for the operating costs of the new facilities including staffing and detainee related costs. New Works Liveability and Opportunity 54,090
Alexander Maconochie Centre Additional Facilities (Design)
Show Map Location
This project will allow for the development of final sketch plans for a facility to meet medium term accommodation requirements. Work in Progress Liveability and Opportunity 5,777
Belconnen Arts Centre Stage 2 (Feasibility and Forward Design)
Show Map Location
This project includes a feasibility study and forward design to investigate options for the construction of stage 2 of the Belconnen Arts Centre. Work in Progress Liveability and Opportunity 300
Canberra Theatre Centre Upgrades
Show Map Location
This project involves upgrading the Canberra Theatre Centre to ensure that the Centre can continue to meet hirer, audience and community requirements as the region’s main performing arts centre. Work in Progress Liveability and Opportunity 3,109
Canberra Theatre Centre Upgrades – Stage 2
Show Map Location
The Government will upgrade the Canberra Theatre and The Playhouse to address workplace health and safety issues and improve functionality, including enhancement to the lighting systems. New Works Liveability and Opportunity 1,850
Common Ground Supportive Housing
Show Map Location
This project provides funding to construct a Common Ground supportive housing complex, providing a model of housing targeting singles and couples, without children, who are homeless or at risk of becoming homeless. This initiative offers affordable housing combined with on-site and assertive support to address the issues and causes of the individual’s homelessness. Work in Progress Liveability and Opportunity 13,500
Cravens Creek Water Quality Control Pond
Show Map Location
This project facilitates the construction of a water quality control pond at Cravens Creek which is required to treat urban stormwater run-off from Denman Prospect before it reaches the Molonglo River. Work in Progress Liveability and Opportunity 21,000
Disability Dual Occupancy Housing
Show Map Location
Three dual occupancy properties are being constructed for clients who, because of the complexity of their disability, need to live alone (single tenancy). Work in Progress Liveability and Opportunity 2,948
Disability Housing – Respite and Congregate Living Housing (Design)
Show Map Location
This project will provide for forward design to renovate existing respite properties operated by Disability ACT to improve service delivery to people with a disability. Work in Progress Liveability and Opportunity 80
Emergency Services Agency Fairbairn – Incident management upgrades
Show Map Location
The Government is funding the modification of the layout of the Communications Centre, Incident Management and Emergency Control Centre within the Emergency Services Agency Headquarters at Fairbairn to support more effective incident management. New Works Liveability and Opportunity 424
Emergency Services Agency Station Upgrade and Relocation – Aranda station
Show Map Location
The Government is funding the construction of a co-located district ambulance and fire station at Aranda to replace the existing Belconnen Fire Station and Belconnen Ambulance Station. New Works Liveability and Opportunity 18,864
ESA Station Upgrade and Relocation – Phase 2 Due Diligence and Design
Show Map Location
This project will deliver further due diligence and Final Sketch Plan designs for additional future sites for new and upgraded emergency services facilities. Work in Progress Liveability and Opportunity 2,690
ESA Station Upgrade and Relocation – South Tuggeranong Station
Show Map Location
This project is for the construction of a new (relocated) fire station in South Tuggeranong (Calwell/Conder) as part of the emergency services facilities upgrade and relocation program. Work in Progress Liveability and Opportunity 17,360
Expansion of Public Housing Energy Efficiency
Show Map Location
This project continues to improve the energy efficiency of public housing stock and will assist the ACT Government in becoming carbon neutral in its operations and services by 2020. Work in Progress Liveability and Opportunity 10,000
Expansion of Social Housing
Show Map Location
Social housing options will be increased with the construction of up to 21 dwellings suitable for the elderly or those with a disability. Work in Progress Liveability and Opportunity 9,446
Expansion of Social Housing – Stage 2
Show Map Location
This project provides for the construction of additional dwellings to support the implementation of Project Independence to address the housing needs of people with disability. Work in Progress Liveability and Opportunity 5,000
Gorman House Multi-Art Hub
Show Map Location
This project will upgrade the Gorman House Arts Centre as a key multi-arts facility that promotes connection and collaboration between hosted organisations and activities, artists and the broader community. Work in Progress Liveability and Opportunity 1,000
Gungahlin Joint Emergency Services Centre – Future use study
Show Map Location
The Government is examining the future use of the Gungahlin Joint Emergency Services Centre to meet the needs of the growing population in the Gungahlin area. New Works Liveability and Opportunity 450
Horse Park Drive Water Quality Control Pond
Show Map Location
This project facilitates the construction of a water quality control pond adjacent to Horse Park Drive which will treat urban stormwater run-off from Jacka and Taylor and provide flood protection to the eastern portion of the proposed suburb of Moncrieff. Work in Progress Liveability and Opportunity 6,000
Housing for Older Tenants – Downsizing initiatives
Show Map Location
The Government will provide $5.816 million in capital funding and $51,000 in recurrent funding over four years to construct and maintain approximately 20 two bedroom units suitable for housing older public housing tenants wishing to relocate from existing larger properties. The cost of this initiative will be met from within existing resources. This work will be phased in from 2015-16. New Works Liveability and Opportunity
Housing for Older People in the Aboriginal and Torres Strait Islander Community
Show Map Location
The Government will provide $1.440 million in capital funding and $93,000 in recurrent funding over four years, to construct and maintain up to five older persons’ units to specifically meet the housing needs of Aboriginal and Torres Strait Islander families. The cost of this initiative will be met from within existing resources. This work will be developed in consultation Aboriginal and Torres Strait Islander community and organisations. New Works Liveability and Opportunity
Kingston Visual Arts Hub (Feasibility Study)
Show Map Location
This project provides funding to undertake feasibility and planning work to progress the development of a Kingston Visual Arts Precinct, including a purpose-built visual arts facility to house Key Visual Arts Organisations. This project will add to the existing visual arts facilities at the precinct. Work in Progress Liveability and Opportunity 300
More Men's Sheds
Show Map Location
This project provides funding for a feasibility and design study to establish additional Men’s Sheds across Canberra. Men’s Sheds provide an opportunity to address a range of issues associated with men’s health and their physical, emotional and social well-being. Work in Progress Liveability and Opportunity 200
New ACT Court Facilities (Design)
Show Map Location
This initiative provides funding for a Public/Private Partnership to redevelop the Supreme Court building and integrate it with the existing Magistrates Court building to provide an integrated Courts Facility. Work in Progress Liveability and Opportunity 5,476
New ACT Courts
Show Map Location
The Government will redevelop the Supreme Court building and integrate it with the existing Magistrates Court building. The project will be delivered through a Public Private Partnership (PPP) with financial close anticipated for late 2015 and availability payments likely to commence approximately two years later. The Government has included an Infrastructure Investment Provision for the new facility in the 2014 15 Budget. Should the Government conclude a suitable agreement to deliver the project through a PPP, the central provision will be removed upon financial close of the project. At that point the recurrent costs of the project (expected to be principally an annual availability payment to the operator of the facility) will be included in the forward estimates. Total estimated investment is not reported due to commercial sensitivities. The Government has invested a total of $5.476 million as funding for the Public Private Partnership to redevelop the Supreme Court building and integrate it with the existing Magistrates Court building to provide an integrated Courts Facility. This initiative was included by the Government in the Appropriation Act 2013-14 (No 2). New Works Liveability and Opportunity
Red Hill Nature Reserve Remediation (Finalisation of Design)
Show Map Location
This project enables further environmental testing and development of a remediation action plan to manage contamination at the old dump site on Red Hill Nature Reserve. Work in Progress Liveability and Opportunity 135
Replacement of Canberra Seniors Centre (Design)
Show Map Location
This project involves a study into the relocation of the Canberra Seniors Centre located in Turner and, as far as practicable, commence site selection, preliminary design and sketch plans. Work in Progress Liveability and Opportunity 650
Security Improvement Program for Elderly Public Housing Tenants
Show Map Location
This project provides additional security measures to improve the safety and security of elderly public housing tenants living in older persons' accommodation and multi-unit complexes. Work in Progress Liveability and Opportunity 1,500
Strategic Bushfire Management Plan
Show Map Location
The Government will continue to implement works to meet the standards and strategies specified in the Strategic Bushfire Management Plan (SBMP). Specific projects include the upgrade, design and construction and maintenance of fire trails and Inner Asset Protection Zones. New Works Liveability and Opportunity 2,744
Stromlo Forest Park Implementation of Bushfire Management Plan
Show Map Location
The Government is providing $1.650 million to implement the recently prepared Stromlo Forest Park Bushfire Management Plan 2013-2019, including development of an Outer Asset Protection Zone for future land releases in Denman Prospect. New Works Liveability and Opportunity 1,650
Woden/Weston Creek Community Hub (Feasibility and Forward Design)
Show Map Location
This feasibility study and forward design will investigate options for a Community Hub in the Woden/Weston Creek region to accommodate a community centre, a childcare centre and a seniors centre Work in Progress Liveability and Opportunity 550
Yarralumla – Canberra Brickworks Site Remediation
Show Map Location
This project allows for the removal of asbestos and other hazardous waste from the Canberra Brickworks site to improve public safety for current and future users of the site. Work in Progress Liveability and Opportunity 2,900

Top of page

Urban Renewal

Project Title Description Type Theme Total Project Value ($'000)
ACT Light Rail Master Plan (Feasibility)
Show Map Location
This project is for a master planning process which will investigate and identify issues for a future Canberra-wide light rail and assess its feasibility. The project will also guide strategic transport and land use planning associated with any future expansion of light rail and identify network issues. Work in Progress Urban Renewal 1,400
ACTION – Replace underground storage tanks
Show Map Location
The Government will replace four steel underground diesel storage tanks at the Tuggeranong Bus Depot which are past their useful life. These tanks will be replaced with a modern above ground system, resulting in ongoing maintenance savings to be reinvested in the business and allowing for easier monitoring of potential contamination. New Works Urban Renewal 6,536
ACTION – Third Major Bus Depot (Feasibility)
Show Map Location
This study is assessing options and providing a preliminary design for a third major bus depot to be located in the Gungahlin/Mitchell area. Work in Progress Urban Renewal 401
Ashley Drive – Stage 1
Show Map Location
This project will improve the capacity of Erindale Drive and upgrades the intersections with Ashley Drive and Sternberg Crescent to reduce traffic congestion. Work in Progress Urban Renewal 7,000
Ashley Drive – Stage 2 (Design)
Show Map Location
This project will allow for the forward design for the duplication of Ashley Drive between Erindale Drive and Johnson Drive. The duplication would seek to address traffic congestion and delays at major intersections along the length of Ashley Drive and provide improved shared path access and on road cycling. Work in Progress Urban Renewal 1,575
Barry Drive – Bridge Strengthening on Commercial Routes
Show Map Location
This project will upgrade the bridge of Barry Drive over Sullivans Creek to enable it to carry vehicles up to unrestricted B-double capacity and to be compliant with the relevant load ratings. This bridge has been identified as a priority on the proposed expanded ACT Higher Mass Limits network and the upgrade is being jointly funded by the Commonwealth Government. Work in Progress Urban Renewal 957
Bridge Strengthening on Commercial Routes
Show Map Location
The Government will undertake bridge strengthening works along the Barton and Monaro Highways to allow usage by higher capacity freight vehicles. The Government’s contribution will be matched by $0.8 million in funding that is to be received from the Commonwealth under the Heavy Vehicle Safety and Productivity Program. New Works Urban Renewal 1,600
City to the Lake – West Basin Public Waterfront (Forward Design)
Show Map Location
This project will deliver the forward design of the public realm works proposed for the Lake Burley Griffin waterfront at West Basin. The design will define the edge of the City to the Lake precinct and a promenade for use by pedestrians, cyclists and slow moving traffic and will link with proposed future amenities at West Basin. Work in Progress Urban Renewal 3,120
City to the Lake Arterial Roads Concept Design
Show Map Location
The Government will further develop designs to modify Parkes Way and Commonwealth Avenue to facilitate urban redevelopment as part of the City to the Lake project. This work will advance the design of possible new intersections with east-west service roads between Edinburgh Avenue overpass and Coranderrk Street and new intersections between Commonwealth Avenue and London Circuit. New Works Urban Renewal 2,750
City to the Lake Assessment (Feasibility)
Show Map Location
This project will assess the requirements and costs of relocating existing roads, stormwater, sewers, water mains and other services as proposed as part of the City to the Lake project. This will include modifications to Parkes Way and West Basin foreshore, to inform future infrastructure investment in the City Centre and progressing the Australia Forum proposal to investment ready status. Work in Progress Urban Renewal 800
Constitution Avenue
Show Map Location
This project provides for the delivery of infrastructure upgrades to Constitution Avenue, including new road carriageways and public realm improvements. Work in Progress Urban Renewal 42,000
Continuation of Urban Infill Program (Feasibility)
Show Map Location
This project provides for continued investigations into suitable infill sites for urban development to meet the Government’s objectives of a compact city. Work in Progress Urban Renewal 764
Coppins Crossing Road and William Hovell Drive Intersection and Road Upgrades (Feasibility)
Show Map Location
This feasibility study will include options for the upgrade of Coppins Crossing Road and related intersections, which will be required to accommodate increased traffic as a result of current and future land development in the Molonglo Valley. Work in Progress Urban Renewal 900
Corroboree Park – Ainslie Park Upgrade
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. New Works Urban Renewal 175
Dickson Group Centre Intersections – Upgrade
Show Map Location
The Government is providing $3.380 million over three years for the upgrade of five intersections in the Dickson Group Centre precinct. The upgrades are to support the redevelopment of the Group Centre. New Works Urban Renewal 3,380
Drinking Fountains and Refill Stations
Show Map Location
This project is for the installation of thirty new drinking fountains in key public locations across Canberra including town centres, sporting fields, hospitals and schools, and provides drinking and refill stations at public events. Work in Progress Urban Renewal 240
East Lake – Planning and Design Framework Implementation (Feasibility)
Show Map Location
This project provides for further environmental and technical investigations to inform and facilitate a variation to the Territory Plan for East Lake. Work in Progress Urban Renewal 250
East Lake Sustainable Urban Renewal
Show Map Location
This project will provide for the continuation of the current partnership with CSIRO, thereby building on established sustainability design principles to develop innovative applications of urban sustainability.  It will also progress work on railway reconfiguration and a roads study.  Work in Progress Urban Renewal 1,720
Environmental Offsets – Gungahlin (EPIC)
Show Map Location
The Government will undertake works to improve the infrastructure and ecological condition of new reserves extending the Gungaderra Grasslands and Mulanggari Nature Reserves and monitoring the habitat and condition of the striped legless lizard. New Works Urban Renewal 462
Environmental Offsets – Lawson South
Show Map Location
The Government will undertake works to improve the infrastructure and ecological condition of the West Macgregor (Jarramlee) offset site and monitoring and improving the habitat and condition of the golden sun moth and natural temperate grassland community. New Works Urban Renewal 872
Fyshwick Depot – Fuel storage tanks removal and site remediation
Show Map Location
The Government will remove underground fuel storage tanks that have been decommissioned at the Fyshwick Depot at 255 Canberra Avenue. New Works Urban Renewal 1,500
Horse Park Drive Extension from Burrumarra Avenue to Mirrabei Drive
Show Map Location
This project involves construction of a 1.3 kilometre extension of Horse Park Drive from Burrumarra Avenue to Mirrabei Drive in North Gungahlin. Work in Progress Urban Renewal 11,500
Horse Park Drive Extension to Moncrieff Group Centre
Show Map Location
The construction of the Horse Park Drive Extension commenced in July 2012 and will deliver a road extension from Amaroo to the Moncrieff Group Centre. Work in Progress Urban Renewal 24,000
Infill Development Infrastructure Studies (Feasibility)
Show Map Location
These studies are investigating infrastructure capacities and upgrade requirements of engineering and service infrastructure for various group centres, rural villages, transport corridors and town centre sites. These studies will inform infill development and redevelopment options to support urban intensification. Work in Progress Urban Renewal 1,500
Inner North – Off Leash Dog Park
Show Map Location
This project involves the design and construction of a fenced off leash dog park in the Inner North of Canberra to provide access to social activities, exercise and training opportunities for dogs and their owners. Work in Progress Urban Renewal 450
Inner North Stormwater Reticulation Network
Show Map Location
This project allows for a trial of the use of captured stormwater from the Flemington Road ponds and the Dickson and Lyneham ponds to replace the use of potable water. Work in Progress Urban Renewal 7,500
Isabella Weir Spillway – Upgrades
Show Map Location
The Government is completing the design and construction of an upgrade to the spillway and dam embankment for Isabella Weir. New Works Urban Renewal 10,100
Isabella Weir Spillway Upgrades (Feasibility)
Show Map Location
This project provides for an assessment of the scope of works needed to increase the capacity of Isabella Weir to reduce the risk of flooding during extreme storm events and development of flood management response measures. Work in Progress Urban Renewal 300
Jerrabomberra Wetlands Infrastructure Improvements
Show Map Location
This project provides for works to improve visitor amenities including improvements to the network of viewing hides, visitor information and education facilities and the construction and enhancement of wetland habitat. Work in Progress Urban Renewal 2,341
John Gorton Drive Extension to Molonglo 2 and Group Centre
Show Map Location
This project is delivering the extension of John Gorton Drive to allow arterial road access to the next development area in Molonglo and to the proposed group centre. Work in Progress Urban Renewal 65,050
Kenny – Floodways, Road Access and Basins (Design)
Show Map Location
This project includes the design of two floodways and stormwater retardation basins to mitigate stormwater flows through Kenny. It will also provide a floodway that will service part of Throsby. Work in Progress Urban Renewal 500
Kingston Foreshore Parking (Design)
Show Map Location
This project will investigate options for parking within the Kingston Foreshore Cultural Precinct. Work in Progress Urban Renewal 200
Lanyon Heritage Precinct Community Access Roads
Show Map Location
This initiative implements Stage 1 of a major upgrade of roads within the Lanyon Heritage Precinct, so as to facilitate community access to, and within, the precinct. Work in Progress Urban Renewal 400
Local Shopping Centre Upgrades Program – Banks
Show Map Location
The Government will continue to support local shopping centres by providing $1.2 million for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. Work in Progress Urban Renewal 1,200
Local Shopping Centre Upgrades Program – Chapman
Show Map Location
The Government will continue to support local shopping centres by providing $1.2 million for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. Work in Progress Urban Renewal 1,100
Local Shopping Centre Upgrades Program – Charnwood
Show Map Location
The Government will continue to support local shopping centres by providing $1.2 million for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. Work in Progress Urban Renewal 1,200
Local Shopping Centre Upgrades Program – Cook
Show Map Location
The Government will continue to support local shopping centres by providing $2 million over two years for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. New Works Urban Renewal 2,000
Local Shopping Centre Upgrades Program – Griffith
Show Map Location
The Government will continue to support local shopping centres by providing $1.2 million for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. Work in Progress Urban Renewal 1,200
Local Shopping Centre Upgrades Program – Kambah (Mannheim St)
Show Map Location
The Government will continue to support local shopping centres by providing $2 million over two years for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. New Works Urban Renewal 2,000
Local Shopping Centre Upgrades Program – Rivett
Show Map Location
The Government will continue to support local shopping centres by providing $2 million over two years for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. New Works Urban Renewal 2,000
Local Shopping Centre Upgrades Program – Theodore
Show Map Location
The Government will continue to support local shopping centres by providing $1.2 million for upgrades at various locations in the Territory. These upgrades will improve safety and amenity and help ensure the commercial viability of the centres. Work in Progress Urban Renewal 1,200
Majura Off Road Shared Path
Show Map Location
This project will provide a continuous grade separated shared path between the Federal Highway and Pialligo Avenue along the alignment of the Majura Parkway. Work in Progress Urban Renewal 8,000
Majura Parkway to Majura Road – Link road construction
Show Map Location
The Government will fund the construction of a link road between Majura Parkway and Majura Road connecting at the Spitfire Avenue roundabout. This road will allow direct vehicular access to the new Majura West Precinct, Canberra Airport – Majura Park and allow for access to new commercial land sites. New Works Urban Renewal 9,856
Molonglo – North-South Arterial Road Bridge and Pedestrian Bridge (Feasibility)
Show Map Location
This project involves the exploration of solutions for improved traffic flows in Molonglo, including the North-South Arterial Road (John Gorton Drive) bridge options and the combined pedestrian/cyclist and sewer crossings. Work in Progress Urban Renewal 300
Molonglo 2 – Uriarra Road Upgrade
Show Map Location
This project provides for the construction of a road linking John Gorton Drive (North Wright) and Uriarra Road, including the construction of three intersections off Uriarra Road. Work in Progress Urban Renewal 17,000
Molonglo 2 – Water Quality Control Ponds, Sewers and Cyclepath (Design)
Show Map Location
This project is to undertake the design of water quality control ponds, sewers and a cycle path to enable infrastructure servicing of the proposed Molonglo Group Centre, which includes commercial and community releases. Work in Progress Urban Renewal 1,000
Molonglo 2 – Water Supply, Trunk Sewer and Stormwater Infrastructure – Stage 1
Show Map Location
This project is to deliver hydraulic infrastructure to facilitate the Molonglo Stage 2 land release, including the design and construction of stormwater drainage infrastructure, trunk water supply and sewer mains. Work in Progress Urban Renewal 10,000
Molonglo 2 Sewer and Pedestrian Bridge over Molonglo River
Show Map Location
This project provides for the design and construction of a combined sewer and pedestrian bridge 280 metres in length crossing the Molonglo River. Work in Progress Urban Renewal 12,400
Molonglo 3 – Hydraulic Services Concept Masterplanning (Feasibility)
Show Map Location
This masterplanning process is to investigate options for water supply, sewers, stormwater management including water quality control ponds and wetlands to support development in north Molonglo, which is identified for future release. Work in Progress Urban Renewal 450
Molonglo 3 – Major Electrical Infrastructure Relocation (Feasibility)
Show Map Location
This project is to investigate the options and cost of relocating existing 132kV high voltage overhead electrical transmission power lines that currently cross proposed land release areas in north Molonglo. Work in Progress Urban Renewal 350
Molonglo 3 – Preliminary Geotechnical Investigation (Feasibility)
Show Map Location
This project will provide for investigation of the soils and substrata in north Molonglo, which is identified for future release. Work in Progress Urban Renewal 275
Molonglo Infrastructure Investment
Show Map Location
The Government will construct a dual carriageway arterial roadway and associated services infrastructure from John Gorton Drive into Molonglo including the new suburb of Denman Prospect. The assets to be constructed include an arterial road, side road connections, water infrastructure for two separate pressure zones, stormwater and sewerage and a services corridor for gas, electricity and communications. New Works Urban Renewal 17,000
Molonglo Riverside Park – Stage 1
Show Map Location
This project provides for essential infrastructure in the Molonglo River Park and fire protection for new suburbs including the protection of endangered species and communities. Work in Progress Urban Renewal 4,500
Molonglo Valley – Finalisation of Stage 2 and Commencement of Stage 3 Planning (Feasibility)
Show Map Location
This project includes a feasibility study for the development of the concept plan for the group centre and environs for Molonglo Stage 2. Work in Progress Urban Renewal 1,570
Molonglo Valley – Implementation of NES Plan – Stage 2
Show Map Location
The Government will deliver commitments in the Molonglo Valley Plan for the Protection of Matters of National Environmental Significance (NES Plan). This includes funding for the maintenance of assets. New Works Urban Renewal 3,520
Molonglo Valley – Implementation of the Commitments in the NES Plan
Show Map Location
This project will allow for the continued implementation of commitments contained in the Molonglo Valley Plan for the Protection of Matters of National Environmental Significance (NES), an agreement made with the Commonwealth Government. Work in Progress Urban Renewal 600
Mugga 2 Quarry – Remediation
Show Map Location
The Government will provide a site for the disposal of fill to support construction and development projects in the ACT region. This project will replace current fill disposal sites that are nearing the end of their useful lives. New Works Urban Renewal 2,939
Mugga Lane – Land Fill Extension – Stage 5
Show Map Location
This project provides for the construction of the first four cells of the Mugga Lane Stage 5 landfill extension and associated works. Work in Progress Urban Renewal 19,850
Mugga Lane – Rehabilitation of Old Landfill Cells
Show Map Location
This project will provide final closure and rehabilitation of closed landfill cells at Mugga Lane, in line with current environmental protection standards and requirements. Work in Progress Urban Renewal 3,100
Mugga Lane – Replace asbestos disposal site
Show Map Location
The Government will construct a new asbestos pit to replace the existing asbestos pit at the Mugga Lane Resource Management Centre. This facility is required to meet the Territory’s future asbestos disposal requirements and provide capacity for industry to safely dispose of waste. New Works Urban Renewal 1,223
Mugga Lane – Replace damaged septic system
Show Map Location
The Government will connect seven buildings at the Mugga Lane Resource Management Centre to the mains sewer system. This project will replace existing septic systems, resulting in ongoing maintenance savings and minimising environmental risks from leaks. New Works Urban Renewal 764
National Arboretum Canberra – Water Security
Show Map Location
This project is for the design and construction of irrigation infrastructure at the National Arboretum Canberra to provide automated water security to turf, plants and forests. Work in Progress Urban Renewal 3,580
Office Accommodation
Show Map Location
This project involves the exploration of options to support the Government's objective to secure office accommodation in Civic. Work in Progress Urban Renewal 2,500
Playground Safety Program
Show Map Location
The Government will provide funding to improve the safety of Canberra’s public playgrounds. New Works Urban Renewal 500
Public Art Scheme
Show Map Location
This scheme will assist in the commissioning and installation of major art works in all town centres. Work in Progress Urban Renewal 7,348
Ramp Metering on Cotter Road
Show Map Location
The Government will complete the design and construction of ramp metering on the Cotter Road northbound on-ramp to the Tuggeranong Parkway, including ramp widening and the installation of monitoring systems. These works will result in smoother traffic movements along the network, reducing congestion and improving efficiencies. The Commonwealth Government is contributing $0.4 million to this initiative under the Nation Building Program. New Works Urban Renewal 700
Recycling Drop Off Centre Upgrades – Belconnen
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Recycling Drop Off Centre upgrades for Tuggeranong, Belconnen Town Centre, Mugga Lane Resource Management Centre and West Belconnen project. New Works Urban Renewal 320
Recycling Drop Off Centre Upgrades – Mugga Lane
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Recycling Drop Off Centre upgrades for Tuggeranong, Belconnen Town Centre, Mugga Lane Resource Management Centre and West Belconnen project. New Works Urban Renewal 320
Recycling Drop Off Centre Upgrades – Tuggeranong
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Recycling Drop Off Centre upgrades for Tuggeranong, Belconnen Town Centre, Mugga Lane Resource Management Centre and West Belconnen project. New Works Urban Renewal 320
Recycling Drop Off Centre Upgrades – West Belconnen
Show Map Location
The Government is investing $50.3m in the 2014-15 Capital Upgrades Program. Capital upgrades include works that extend the useful life or improve the service delivery capacity of existing Territory physical infrastructure assets. This project is a component of the Recycling Drop Off Centre upgrades for Tuggeranong, Belconnen Town Centre, Mugga Lane Resource Management Centre and West Belconnen project. New Works Urban Renewal 320
Remediation of Fuel Storage Facilities
Show Map Location
This project will undertake the remediation of non-operational fuel storage tanks at ACT Government sites. Work in Progress Urban Renewal 2,010
Revitalisation of Civic and Braddon (Design)
Show Map Location
This project involves the design of improvements to public amenity in North Canberra including public realm improvements in Braddon, lighting and footpaths in Allara Street and Akuna Street in the City, and landscaping connections from Northbourne Avenue to City Hill. Work in Progress Urban Renewal 750
Shopping Centre Upgrade Program – Red Hill and Lyons
Show Map Location
This project includes the forward design and construction of upgrades to Red Hill and Lyons Shopping Centres, including pedestrian safety and crossings, parking, repaving, traffic flow measures, new lighting, street furniture, landscape treatments and public artwork. Work in Progress Urban Renewal 8,000
Stromlo Forest Park Planning and Infrastructure
Show Map Location
This project provides facilities and designs infrastructure for future development at Stromlo Forest Park. Work in Progress Urban Renewal 2,800
Throsby – Access Road (Design)
Show Map Location
This project provides for the design of a road into the new suburb of Throsby from Horse Park Drive to facilitate land releases and development. Work in Progress Urban Renewal 1,000
Throsby – Access road and western intersection
Show Map Location
The Government will provide $5.3 million over three years for the upgrade of the intersection of Horse Park Drive and Anthony Rolfe Avenue, the installation of services infrastructure within the road corridor and the construction of an access road into Throsby. New Works Urban Renewal 5,300
Town and District Park Upgrades
Show Map Location
This project will implement improvements to a number of Town and District Parks, including Eddison Park, Black Mt Peninsula and Weston Park. Work in Progress Urban Renewal 6,150
Transport for Canberra – Bus Stop Upgrades to Disability Standards – Stage 2
Show Map Location
This project provides for improvements to bus stops and shelters across the Territory to ensure compliance with the Disability Discrimination Act 1992 standards. Work in Progress Urban Renewal 4,500
Transport for Canberra – City Path Lighting
Show Map Location
This project will increase lighting along community shared paths into the City. Work in Progress Urban Renewal 400
Transport for Canberra – Majura Parkway
Show Map Location
This project will deliver improved freight and commuter traffic flows and safety along Majura Parkway by ultimately linking the Monaro Highway to the Federal Highway. Work in Progress Urban Renewal 288,000
Transport for Canberra – Park and Ride Facilities
Show Map Location
This project provides for preliminary concept designs to deliver new park and ride and bike and ride facilities across Canberra. Work in Progress Urban Renewal 300
Transport for Canberra – Upgrading Erindale bus station
Show Map Location
The Government will construct a new bus station at Erindale, which will improve passenger amenity and safety. The proposed works are in keeping with the targets set in Transport for Canberra to increase public transport mode share. New Works Urban Renewal 900
Transport for Canberra – Walking and Cycling Infrastructure – Stage 3
Show Map Location
This program of works in progress is designed to improve cycling and walking infrastructure across the Territory through the construction of new on and off road cycle and community paths and related signage. Work in Progress Urban Renewal 5,500
Urban Development Sequence for Affordable Housing (Feasibility)
Show Map Location
This project is supporting the Affordable Housing Action Plan through planning and infrastructure investigations in new Greenfield areas which will provide for long-term planning options regarding land supply. Work in Progress Urban Renewal 1,400
West Belconnen – Roads and Traffic (Feasibility)
Show Map Location
This initiative provides for the investigation of the potential impact of land release in West Belconnen on the existing transport network and examining options to address issues identified. Work in Progress Urban Renewal 325
West Belconnen – Stormwater, Hydraulic and Utility Services (Feasibility)
Show Map Location
The Government’s land release program includes the development of land in West Belconnen. This project is to investigate the options for servicing this proposed development with water, sewer, stormwater and other services. Work in Progress Urban Renewal 350
West Belconnen Resource Management Centre Rehabilitation of Landfill Cells
Show Map Location
This project will provide final closure and rehabilitation of closed landfill cells at West Belconnen, to meet environmental protection standards. Work in Progress Urban Renewal 1,865
Weston Creek Group Centre Parking
Show Map Location
The Government will invest in the construction and maintenance of additional surface car parking in Dillon Close and Liardet Street and pedestrian safety improvements on Namatjira Drive. A portion of the proposed parking spaces will be allocated as Park and Ride facilities. New Works Urban Renewal 500
William Slim/Barton Highway Roundabout Signalisation
Show Map Location
The Government will invest $10 million over three years for the upgrade of the William Slim and Barton Highway intersection. Works will include the signalisation of the roundabout, the provision of additional lanes on the roundabout and approaches, bus priority measures and ancillary works including bridge structures and a shared path bridge across Ginninderra Creek. New Works Urban Renewal 10,000
Woden Bus Interchange – Early Works
Show Map Location
This project will deliver the decoupling of buildings and preparatory demolition works around the bus interchange at Woden, which will clean up the site to improve public safety and support urban redevelopment opportunities in Woden. Work in Progress Urban Renewal 1,750
Woden Bus Interchange Redevelopment Stage 1
Show Map Location
The Government will invest $3.250 million over two years for works to deliver public safety and public realm improvements to the Woden Bus Interchange. The works include the construction of stairs, ramps and lighting, as well as the demolition of redundant structures. New Works Urban Renewal 3,250
Woden Bus Interchange Redevelopment (Finalisation of Design)
Show Map Location
This project provides for the design of a new integrated and modern bus interchange at Woden which will improve public safety and public transport infrastructure and support urban redevelopment opportunities in Woden. Work in Progress Urban Renewal 750
Wright Outer Asset Protection Zone – Stromlo Forest Park
Show Map Location
This project includes progressing work on the design of a 350 metre wide Outer Asset Protection Zone on the eastern and northern borders of Stromlo Forest Park. Work in Progress Urban Renewal 250