Woden Weston and Molonglo

Infrastructure projects for Woden, Weston Creek and Molonglo will support economic activity and jobs within the industry.  These projects promote activity to create a healthier community and improve facilities and living standards in the community to build a fairer and more equitable city.

There are also projects that assist in up-skilling and educating our community and improve the amenity of our city to make Canberra a more liveable and accessible place to reside and work.

Capital initiatives currently funded include:

A Fairer Canberra

  • $7.5 million for construction of Holder Early Childhood Centre.
  • $0.550 million feasibility for Woden/Weston Creek Community Hub.

A Strong Diverse Economy

  • $72 million for John Gorton Drive Extension to Molonglo 2 and Group Centre.
  • $28.5 million for North Weston – Road Intersection Reconstruction.
  • $17 million for the construction of Molonglo 2 – Uriarra Road Upgrade.
  • $12.4 million for the construction for Molonglo 2 – Sewer and Pedestrian Bridge over Molonglo River.
  • $10 million for Molonglo 2 – Water Supply, Trunk Sewer and Stormwater Infrastructure – Stage 1.
  • $7.150 million for Transport for Canberra – Cotter Road Improvements.
  • $3.5 million for the construction of Molonglo 2 – Trunk Sewer and Stormwater Infrastructure from Holdens Creek.
  • $1.570 million for Molonglo Valley – Finalisation of Stage 2 and Commencement of Stage 3 Planning (Feasibility).
  • $1.080 million for Cotter Road Duplication Stage 2 – Yarralumla Creek Bridge to Tuggeranong Parkway (Design).
  • $1 million for Molonglo 2 – Water Supply, Trunk Sewer and Stormwater Infrastructure – Stage 2 (Design).
  • $0.460 million for the design of Woden Stormwater Infrastructure.
  • $0.450 million for Molonglo – East-West Arterial Road and Extension of John Gorton Drive to Molonglo River (Feasibility).
  • $0.3 million for Molonglo – North-South Arterial Road Bridge and Pedestrian Bridge (Feasibility).
  • $0.253 million for Uriarra Road Upgrade (Design).
  • $0.250 million for Wright Outer Asset Protection Zone – Stromlo Forest Park.

A More Liveable City

  • $55 million for North Weston Pond.
  • $22.620 million for the Official Opening 2013 – National Arboretum Canberra.
  • $18.6 million for the National Arboretum Canberra (Commonwealth Contribution).
  • $12.4 million for the construction for Molonglo 2 – Sewer and Pedestrian Bridge over Molonglo River.
  • $8.150 million for Shopping Centre Upgrade Program – Lyons and Red Hill.
  • $4.5 million for the Molonglo Riverside Park Stage 1.
  • $3.666 million for Transport for Canberra – Woden Bus Depot Upgrade.
  • $2.8 million for Stromlo Forest Park Planning and Infrastructure.
  • $1.9 million for Molonglo Riverside Park Planning (Design).
  • $1.4 million for Molonglo Valley – Implementation of Commitments in the NES Plan.
  • $1 million for the North Weston/Molonglo Stormwater Harvesting Scheme.
  • $0.5 million for the construction of Duffy – Stormwater Augmentation Stage 1.
  • $0.4 million for Woden Valley Stormwater Retardation Basins (Design).
  • $0.3 million for Mugga Lane – Clean Fill Transfer Site – Technical Investigation and Design.
  • $0.250 million for Molonglo Valley – Sewer Vent Odour Study.
  • $0.250 million for Woden Valley – Stormwater Retardation Basins (Feasibility).
  • $0.2 million for Molonglo – Path Connections from John Gorton Drive to Molonglo Path Network (Design).
  • $0.2 million for Molonglo Valley – Environmental Impact Statement for Deferred Area.
  • $0.2 million for Stromlo Forest Park Soil Conservation Works.
  • $0.2 million for Molonglo Leisure Centre (Feasibility).

Educated And Skilled Community

  • $9.350 million for Canberra College (Woden Campus) Performing Arts Theatre.
  • $3.050 million for Malkara School – Hydrotherapy Pool Refurbishment.
  • $2.8 million for the Duffy Primary School Expansion.
  • $1.950 million for Molonglo (Coombs) Primary School (Design).
  • $1.4 million for Canberra College Cares (CC Cares) Program (Design).

Healthier and More Active Community

  • $111.060 million for the construction of the Women and Children's Hospital.
  • $61.090 million Provision for Project Definition Planning.
  • $41 million for Enhancing Canberra Hospital Facilities (Design).
  • $29.652 million for the Integrated Cancer Centre – Phase 1.
  • $25.7 million for Clinical Services Redevelopment – Phase 3.
  • $22.3 million for Staging and Decanting – Moving To Our Future at the Canberra Hospital.
  • $19.430 million for Staging, Decanting and Continuity of Services.
  • $19.319 million for the Health Infrastructure Program – Project Management at the Canberra Hospital.
  • $17.7 million for the Linear Accelerator Procurement and Replacement.
  • $17.270 million for Central Sterilising Services.
  • $15.102 million for Integrated Cancer Centre – Phase 2.
  • $10.088 million for National Health Reform.
  • $9.8 million for the Clinical Services Redevelopment – Phase 2.
  • $4.117 million for HIP Change Management and Communication Support.
  • $1.3 million for ACT Health Skills Development Centre.
  • $0.775 million for Mental Health Young Persons Unit.

Detailed map of Capital Projects [PDF document PDF 3.18MB]