Region Navigation

All Regions | Budget Map

Legend / Toggles
Active Canberra – Healthy Canberra Active Canberra – Healthy Canberra
Educated Capital Educated Capital  
Growing the Economy Growing the Economy  
Healthy Cities Healthy Cities  
Liveability and Opportunity Liveability and Opportunity
Urban Renewal Urban Renewal  

Active Canberra – Healthy Canberra

Project Title Description Type Theme Total Project Value ($'000)
Manuka Oval – New Spectator Facilities and Media Infrastructure
Show Map Location
This project will increase Manuka Oval’s capacity by an additional 1,400 seats and enhance its spectator facilities and media infrastructure, which will improve its commercial viability and reduce subsidies required to host major events. New Work Active Canberra – Healthy Canberra 4,056
Narrabundah Velodrome Upgrade
Show Map Location
This project is to facilitate urgent remediation of the Narrabundah Velodrome following closure of the facility due to safety reasons. The works will ensure the safety and functionality of the facility for cycling participants in the Territory. New Work Active Canberra – Healthy Canberra 650
Franklin – Community Recreation Irrigated Park Enhancement
Show Map Location
This project provides for the construction, in partnership with the Land Development Agency, of a Community Recreation Irrigated Park in Franklin. The facility will provide the local community with a high quality recreation space that will support a range of informal sport, recreation and physical activity outcomes. New Work Active Canberra – Healthy Canberra 500
Lyneham Sports Precinct – Central Amenities (Design)
Show Map Location
This project provides for the design of central amenities at Southwell Park to support the multitude of sporting community users and attract greater recreational access. New Work Active Canberra – Healthy Canberra 500
Melrose Synthetic Football Facility (Design)
Show Map Location
This project provides for the design of a synthetic football facility at Melrose High School. The final design will serve both the needs of the school and football communities, providing critical infrastructure to meet growing participation levels. New Work Active Canberra – Healthy Canberra 200
Netball Infrastructure Upgrades (Design)
Show Map Location
This project provides for the design of upgrades at various netball facilities across the Territory to improve safety, quality and accessibility. New Work Active Canberra – Healthy Canberra 200
Stromlo Forest Park – Enclosed Oval (Feasibility)
Show Map Location
This project provides for a feasibility study of an enclosed oval within Stromlo Forest Park to service the needs of the community and sporting groups, in particular AFL, football, rugby union and rugby league codes. New Work Active Canberra – Healthy Canberra 200
Greenway Oval Improvements (Design)
Show Map Location
This project provides for the design of upgrades of existing facilities at the Greenway Enclosed Oval to improve the size and accessibility of amenities to support the Tuggeranong Hawks Football Club, the Bushrangers Rugby League Club and the Tuggeranong Tornadoes Gridiron Club. New Work Active Canberra – Healthy Canberra 40
Gungahlin Pool
Show Map Location
The project is for construction of a contemporary leisure centre for the Gungahlin community, incorporating aquatic leisure facilities, dry activity areas and appropriate support amenities. Work in Progress Active Canberra – Healthy Canberra 26,300
"Where Will We Play" Outdoor Facilities Water Reduction Strategies
Show Map Location
The project will continue with the implementation of solutions to reduce potable water consumption and secure non-potable irrigation options for a number of ACT sporting facilities, including the construction of water tanks at Inner North playing fields and the design of Woden Park Athletics Track. Work in Progress Active Canberra – Healthy Canberra 16,000
Lyneham Sports Precinct Development – Stage 1
Show Map Location
The project will continue to deliver significant enhancements to the Lyneham Precinct at Southwell Park. Work in Progress Active Canberra – Healthy Canberra 8,600
Gungahlin Enclosed Oval – Construction of Grandstand
Show Map Location
This project involves construction of a grandstand on the western side of Gungahlin Enclosed Oval to provide a high quality facility for the local community. Work in Progress Active Canberra – Healthy Canberra 6,500
Manuka Oval Redevelopment – Stage 1A
Show Map Location
Works undertaken as part of this project include the establishment of a new sub-surface profile, irrigation system and returfing. The project is also delivering a new seven wicket block and associated integration works within the seating bowl. Work in Progress Active Canberra – Healthy Canberra 5,000
Lyneham Precinct – Asbestos Remediation
Show Map Location
This project involves the removal of asbestos contamination at the Lyneham sports precinct. Work in Progress Active Canberra – Healthy Canberra 4,600
Lyneham Precinct Redevelopment Stage 3
Show Map Location
This project continues work on the redevelopment of the Lyneham Precinct (Southwell Park) in accordance with the revised Master Plan. Work in Progress Active Canberra – Healthy Canberra 4,600
Lyneham Precinct – Regional Tennis and Sports Centre – Stage 2
Show Map Location
This project continues the redevelopment of Lyneham Precinct at Southwell Park in accordance with the concept plan. Work in Progress Active Canberra – Healthy Canberra 4,000
Restoration of Sportsgrounds – Bonython
Show Map Location
This project is for the restoration of the neighbourhood oval in Bonython, which is being upgraded to provide the local community with high quality sporting facilities. Work in Progress Active Canberra – Healthy Canberra 4,000
Restoration of Sportsgrounds – Watson
Show Map Location
This project is for the restoration of the neighbourhood oval in Watson, which is being upgraded to provide the local community with high quality sporting facilities. Work in Progress Active Canberra – Healthy Canberra 4,000
Restoration of Sportsgrounds – Weetangera
Show Map Location
This project is for the restoration of the neighbourhood oval in Weetangera, which is being upgraded to provide the local community with high quality sporting facilities. Work in Progress Active Canberra – Healthy Canberra 4,000
Grant for Development of a New Basketball Centre and Player Amenities
Show Map Location
This project continues the delivery of funding support for construction of a new facility to increase the space available for basketball competition and training in the ACT. Work in Progress Active Canberra – Healthy Canberra 3,000
Tuggeranong – Multi-use Indoor Community Facility and Men's Shed
Show Map Location
This project is for the construction of a multi-use Indoor Community Sport Facility at Greenway. The facility will support indoor sport, primarily Archery, and will include a separate area allocated for the Tuggeranong branch of the Men's Shed. Work in Progress Active Canberra – Healthy Canberra 2,100
Manuka Oval Redevelopment (Design)
Show Map Location
This project continues the design of the upgrade of Manuka Oval to enhance facilities for spectators, the media and corporate partners as part of the agreement with the AFL and Greater Western Sydney. Work in Progress Active Canberra – Healthy Canberra 1,152
Canberra Stadium – Replacement of Ticket Boxes and Entry Gates
Show Map Location
This project includes new ticket boxes and entry systems to the Canberra Stadium to meet Work Health and Safety standards and improve operational efficiency. Work in Progress Active Canberra – Healthy Canberra 1,000
Improve the Quality of Sportsgrounds
Show Map Location
This provides for water demand activities to reduce irrigation requirements at sportsgrounds including replacing inefficient irrigation systems and expanding the use of drought tolerant grass species. Work in Progress Active Canberra – Healthy Canberra 1,000
Motorsport Funding
Show Map Location
This project involves the preparation, consultation and development of documentation to support the preferred design option for off-road motorcycle facility at Pierces Creek. Work in Progress Active Canberra – Healthy Canberra 500
Motorsports Fund – Capital Improvements to Fairbairn Park (Design)
Show Map Location
This project continues the planning, design and documentation to provide for the implementation of improvements to the Fairbairn motorsports facility. Work in Progress Active Canberra – Healthy Canberra 500
Throsby Multisport Complex (Design)
Show Map Location
The project is delivering the design of an innovative multisport complex to be located in Throsby which will include outdoor playing surfaces for summer and winter sports, indoor sport and recreation spaces, and associated amenities. Work in Progress Active Canberra – Healthy Canberra 500
New Stadium Feasibility Study
Show Map Location
This project is to undertake feasibility and investigation of works for the development of a new Canberra Stadium as part of the proposed City to the Lake redevelopment or at an alternate location in Canberra. Work in Progress Active Canberra – Healthy Canberra 300
Canberra Stadium – Western Stand and Associated Infrastructure Structural Condition Audit
Show Map Location
This project is to undertake a structural condition assessment of the Western Stand (Mal Meninga Stand) to assess its current utility. Work in Progress Active Canberra – Healthy Canberra 58

Top of page

Educated Capital

Project Title Description Type Theme Total Project Value ($'000)
Canberra College Cares – New Building at Phillip Campus
Show Map Location
This project will construct a new purpose-built facility for the Canberra College Cares (CC Cares) program at the Canberra College Woden campus. The new facility will provide learning spaces and facilities to support young pregnant and parenting students and their children. New Work Educated Capital 14,000
School Infrastructure for the Future
Show Map Location
This project provides for repairs, maintenance and upgrades to ACT public schools, addressing ageing building fabric and changes to education services delivery. New Work Educated Capital 3,345
Belconnen High School Modernisation – Stage 1
Show Map Location
This project provides for improvements at Belconnen High School. This project funds improvement works to six classrooms, the school front office and administration areas and the school hall. New Work Educated Capital 2,000
Childcare Centre Upgrades – Stage 2
Show Map Location
This project provides for the refurbishment and upgrade of ACT Government owned childcare centres. New Work Educated Capital 2,000
Tuggeranong Introductory English Centre
Show Map Location
This project provides for the establishment of a new introductory English centre at the Wanniassa Hills Primary School. The new facility will give students with limited or no English speaking background, who have recently arrived in Australia and Canberra, the opportunity for intensive language tuition before settling into a mainstream school in the Tuggeranong school network. New Work Educated Capital 1,800
Coombs Primary School (Finalisation of Design)
Show Map Location
This project will complete designs for the Coombs School that will provide essential public preschool and primary school facilities, in Molonglo. New Work Educated Capital 550
Improved VET Provision in South Canberra (Feasibility Study)
Show Map Location
This feasibility study will investigate how Canberra Institute of Technology education can be best provided for in the Woden Valley, Weston Creek, Tuggeranong and Molonglo communities. New Work Educated Capital 180
Bonner Primary School
Show Map Location
Bonner Primary School opened in 2013 school year and provides essential public preschool and primary school facilities for North Gungahlin. This project will be financially completed in the 2013-14 financial year. Work in Progress Educated Capital 46,270
Franklin Early Childhood School
Show Map Location
Franklin Early Childhood School opened in 2013 and provides facilities for children from birth to eight years of age. The project will be financially completed in 2013-14. Work in Progress Educated Capital 28,700
Trade Training Centres
Show Map Location
This Commonwealth funded program will establish the Tuggeranong Sustainable Living Trade Training Centre. The Centre includes new construction and refurbishment works at Erindale and Lake Tuggeranong Colleges and refurbishment works at four high schools in the Tuggeranong district. Work in Progress Educated Capital 17,269
Rectification and Upgrade of Taylor Primary School
Show Map Location
This project involves the removal of asbestos containing materials from the school, upgrading and replacing core infrastructure and providing quality 21st century learning and teaching environments at Taylor Primary School. Work in Progress Educated Capital 12,930
Upgrade of Early Childhood Facilities
Show Map Location
This program is the first stage of capital works to upgrade and expand ACT Government owned childcare centres in line with the National Quality Framework for Early Childhood Education and Care – Physical Environment Standards. Stage 1 of the program involves upgrades and extensions at nine existing early childhood centres. Work in Progress Educated Capital 7,236
COAG Universal Access to Preschools – Stage 1 Expansion Works
Show Map Location
Stage 1 of this initiative involves upgrades and extensions at 12 existing ACT Government preschools to ensure compliance with the National Quality Framework – Physical Environment Standards. Work in Progress Educated Capital 6,200
West Macgregor Development – Macgregor Primary School Expansion
Show Map Location
This project involves the refurbishment and extension of Macgregor Primary School to expand the school from a 3-stream school to a 4-stream school which will meet the increased enrolment demand in the West Belconnen region. Work in Progress Educated Capital 5,650
North Watson Development – Majura Primary School Expansion
Show Map Location
This project involves the refurbishment and extension of Majura Primary School to expand the school from a 3-stream school to a 4-stream school to meet the increased enrolment demand in North Canberra. Work in Progress Educated Capital 4,400
Carbon Neutral Schools – Stage 1
Show Map Location
This initiative is to support ACT public schools to move towards carbon neutrality. Work in Progress Educated Capital 3,500
Duffy Primary School Expansion
Show Map Location
This initiative involves increasing capacity at Duffy Primary School, through the use of relocatable buildings, to meet increased demand within the Weston Creek area. Work in Progress Educated Capital 2,800
Holt Preschool Refurbishment
Show Map Location
This project provides for the refurbishment and upgrade of the Holt preschool with a view to establishing an early childhood centre, occasional care centre, playgroup or playschool. Work in Progress Educated Capital 500

Top of page

Growing the Economy

Project Title Description Type Theme Total Project Value ($'000)
Majura Parkway Estate Development (Design)
Show Map Location
This project provides for assessment and design of infrastructure requirements to facilitate a potential commercial development in the vicinity of the Majura Parkway adjacent to the Canberra Airport commercial precinct. New Work Growing the Economy 600
Greenfields Planning for Affordable Housing (Feasibility)
Show Map Location
This project will allow for continued planning and infrastructure investigations in greenfields areas to support Government priorities, land supply and land release related to the provision of affordable housing. New Work Growing the Economy 350
New Camping Area
Show Map Location
This project will develop a site adjacent to the existing camping grounds to suit larger caravans, rigs and converted buses. New Work Growing the Economy 300
Car Park Upgrade to Enhance Accessibility
Show Map Location
This project will create 25 accessible car parking spaces at the northern car park of Exhibition Park in Canberra, by sealing and properly marking accessible parking bays with a sealed walkway, and drop off points at the northern entry gate. New Work Growing the Economy 120

Top of page

Healthy Cities

Project Title Description Type Theme Total Project Value ($'000)
Clinical Services and Inpatient Unit Design and Infrastructure Expansion
Show Map Location
This project will prepare a proof of concept and forward design for major clinical buildings at the Canberra Hospital, expansion of the Emergency Department on finalisation of proof of concept, and provision of a paediatric service in the Canberra Hospital Emergency Department. New Work Healthy Cities 40,780
Continuity of Health Services Plan – Essential Infrastructure
Show Map Location
This program provides the design and construction (or fit-out) of a range of facilities to allow additional bed capacity to be provided across the public health system in the Territory. It also allows for implementation of new campus infrastructure, and the replacement and expansion of existing infrastructure to ensure that essential infrastructure. New Work Healthy Cities 20,367
University of Canberra Public Hospital (Design)
Show Map Location
This project will complete facility planning and forward design to final sketch plan stage for the University of Canberra Public Hospital. New Work Healthy Cities 8,252
Calvary Hospital Car Park (Design)
Show Map Location
This project is to design a multi storey car park for up to 700 vehicles on the Calvary Hospital campus. New Work Healthy Cities 1,300
Belconnen and Tuggeranong Walk-In Centres
Show Map Location
This project provides the design and construction (fit-out) of new Walk in Centres at the Tuggeranong Health Centre and the Belconnen Health Centre. New Work Healthy Cities 951
Women and Children's Hospital
Show Map Location
This initiative will enable the development of a Women’s and Children’s Hospital consistent with the objectives and priorities of the Health Infrastructure Program. This will incorporate the new neonatal intensive care unit, a new paediatric unit and extended and refurbished maternity and gynaecology units. Work in Progress Healthy Cities 111,060
Enhanced Community Health Centre – Belconnen
Show Map Location
This initiative provides for the forward design and construction of an Enhanced Community Health Centre (ECHC) at Belconnen. The ECHC will provide an increased number of traditional community health services and an expanded range of higher order clinical services. Work in Progress Healthy Cities 51,344
Adult Acute Mental Health Inpatient Unit
Show Map Location
This project provides for the construction of a 40 bed Adult Mental Health Inpatient Unit at the Canberra Hospital, replacing the existing facility. The project is physically complete and operational. Work in Progress Healthy Cities 28,480
Staging and Decanting – Moving To Our Future
Show Map Location
A program of works is underway to relocate Health Directorate services for continuity of services during staged implementation of the Health Infrastructure Program redevelopment. Work in Progress Healthy Cities 22,300
Clinical Services Redevelopment – Phase 3
Show Map Location
This project will upgrade campus wide infrastructure at the Canberra Hospital such as campus ring mains, replacement of plant and equipment, and relocation of services. Work in Progress Healthy Cities 21,800
Central Sterilising Services
Show Map Location
This project includes the construction of a new sterilising facility at the Canberra Hospital to replace the existing facility at Mitchell. Work in Progress Healthy Cities 17,270
Integrated Cancer Centre – Phase 2
Show Map Location
An additional floor will be constructed at the Integrated Cancer Centre that will provide up to 10 additional treatment spaces, fitout for a cytoxic pharmacy, pathology space and a general storeroom. Work in Progress Healthy Cities 15,102
Tuggeranong Health Centre – Stage 2
Show Map Location
This initiative will supplement funding provided in the 2008-09 Budget to expand and enhance the health services provided at the Tuggeranong Health Centre. Work in Progress Healthy Cities 14,000
Clinical Services Redevelopment – Phase 2
Show Map Location
This initiative provides for the relocation of services, refurbishment of major infrastructure at the Canberra Hospital and early construction works for new facilities associated with the Health Infrastructure Program. Work in Progress Healthy Cities 8,850
Aboriginal Torres Strait Islander Residential Alcohol and Other Drug Rehabilitation Facility
Show Map Location
This project will provide a culturally appropriate alcohol and drug residential rehabilitation facility for adult Aboriginal and Torres Strait Islander people in the ACT. The facility will provide for eight beds, with potential to expand to 16 beds as required. Work in Progress Healthy Cities 7,933
Refurbishment of Health Centre – Tuggeranong
Show Map Location
This initiative provides for the refurbishment of existing health centres to meet the changing needs of the communities they serve. Work in Progress Healthy Cities 5,000
Northside Hospital Specification and Documentation
Show Map Location
This initiative provides for the development of specifications and documentation for the proposed Northside Hospital (now the University of Canberra Public Hopsital). Work in Progress Healthy Cities 4,000
Enhanced Community Centre Backup Power – Tuggeranong
Show Map Location
This project addresses the expected growth and demand for Health Services in the ACT by providing additional backup power to support the continuity of ICT services at the Tuggeranong Community Health Centre. Work in Progress Healthy Cities 3,540
Enhanced Community Centre Backup Power – Belconnen
Show Map Location
This project addresses the expected growth and demand for Health Services in the ACT by providing additional backup power to support the continuity of ICT services at the enhanced Belconnen Community Health Centre. Work in Progress Healthy Cities 3,540
Adult Secure Mental Health Unit (Finalising Design)
Show Map Location
This project is to undertake a design brief and forward design for a 25 bed low and medium secure mental health inpatient unit. Work in Progress Healthy Cities 2,000
Mental Health Young Persons Unit
Show Map Location
This initiative is for the forward design of an inpatient mental health facility, adjacent to the Calvary Hospital, which will comprise 20 beds and a secure subdivision in order to meet the needs and safety of younger clients from 13-25 years. Work in Progress Healthy Cities 775

Top of page

Liveability and Opportunity

Project Title Description Type Theme Total Project Value ($'000)
Cravens Creek Water Quality Control Pond
Show Map Location
This project facilitates the construction of a water quality control pond at Cravens Creek which is required to treat urban stormwater run-off from Denman Prospect before it reaches the Molonglo River. New Work Liveability and Opportunity 21,000
ESA Station Upgrade and Relocation – South Tuggeranong Station
Show Map Location
This project is for the construction of a new (relocated) fire station in South Tuggeranong (Calwell/Conder) as part of the emergency services facilities upgrade and relocation program. New Work Liveability and Opportunity 17,360
Horse Park Drive Water Quality Control Pond
Show Map Location
This project facilitates the construction of a water quality control pond adjacent to Horse Park Drive which will treat urban stormwater run-off from Jacka and Taylor and provide flood protection to the eastern portion of the proposed suburb of Moncrieff. New Work Liveability and Opportunity 7,500
Common Ground Supportive Housing
Show Map Location
This project provides funding to construct a Common Ground supportive housing complex, providing a model of housing targeting singles and couples, without children, who are homeless or at risk of becoming homeless. This initiative offers affordable housing combined with on-site and assertive support to address the issues and causes of the individual’s homelessness. New Work Liveability and Opportunity 7,000
Alexander Maconochie Centre Additional Facilities (Design)
Show Map Location
This project will allow for the development of final sketch plans for a facility to meet medium term accommodation requirements. New Work Liveability and Opportunity 3,000
Yarralumla – Canberra Brickworks Site Remediation
Show Map Location
This project allows for the removal of asbestos and other hazardous waste from the Canberra Brickworks site to improve public safety for current and future users of the site. New Work Liveability and Opportunity 2,900
Ainslie Music Hub
Show Map Location
This project will enable upgrades to the Ainslie Arts Centre to enhance its use as a Music Hub, with a focus on music for young people and to provide a public access community performance space. New Work Liveability and Opportunity 1,500
Local Area Traffic Management
Show Map Location
This project enables the forward design of prioritised traffic management works in four locations, and the construction of a number of high priority measures to address amenity and safety considerations. New Work Liveability and Opportunity 1,000
Gorman House Multi-Art Hub
Show Map Location
This project will upgrade the Gorman House Arts Centre as a key multi-arts facility that promotes connection and collaboration between hosted organisations and activities, artists and the broader community. New Work Liveability and Opportunity 1,000
Transport for Canberra – Walking and Cycling Infrastructure – Stage 4 (Feasibility)
Show Map Location
This initiative provides for feasibility and forward design of walking and cycling infrastructure improvements across the Territory. The program supports the objectives of the Transport for Canberra Plan relating to modal shift and active travel methods. New Work Liveability and Opportunity 900
Transport for Canberra – Walking and Cycling Infrastructure – Stage 4 (Design)
Show Map Location
This project is for feasibility and forward design of walking and cycling infrastructure improvements across the Territory. The program supports the objectives of the Transport for Canberra Plan relating to modal shift and active travel methods. New Work Liveability and Opportunity 773
Kingston Visual Arts Hub (Feasibility Study)
Show Map Location
This project provides funding to undertake feasibility and planning work to progress the development of a Kingston Visual Arts Precinct, including a purpose-built visual arts facility to house Key Visual Arts Organisations. This project will add to the existing visual arts facilities at the precinct. New Work Liveability and Opportunity 300
Housing for Elderly Public Housing Tenants (Design)
Show Map Location
This project provides funding to design options for older public housing tenants wishing to relocate to more appropriate and suitable housing that better suits their needs and age. New Work Liveability and Opportunity 290
More Men's Sheds
Show Map Location
This project provides funding for a feasibility and design study to establish additional Men’s Sheds across Canberra. Men’s Sheds provide an opportunity to address a range of issues associated with men’s health and their physical, emotional and social well-being. New Work Liveability and Opportunity 200
Red Hill Nature Reserve Remediation (Finalisation of Design)
Show Map Location
This project enables further environmental testing and development of a remediation action plan to manage contamination at the old dump site on Red Hill Nature Reserve. New Work Liveability and Opportunity 135
Disability Housing – Respite and Congregate Living Housing (Design)
Show Map Location
This project will provide for forward design to renovate existing respite properties operated by Disability ACT to improve service delivery to people with a disability. New Work Liveability and Opportunity 80
Housing for Older People in the Aboriginal and Torres Strait Islander Community (Design)
Show Map Location
This project provides funding to design culturally appropriate housing that best suits the needs of elderly Aboriginal and Torres Strait Islander people. New Work Liveability and Opportunity 75
ESA Station Upgrade and Relocation – Charnwood Station
Show Map Location
This project involves construction of a new joint fire and ambulance station at Charnwood. Work in Progress Liveability and Opportunity 21,318
Coombs – Water Quality Control Ponds
Show Map Location
This project includes the construction of two ponds in the new suburb of Coombs. Work in Progress Liveability and Opportunity 17,000
Expansion of Public Housing Energy Efficiency
Show Map Location
This project continues to improve the energy efficiency of public housing stock and will assist the ACT Government in becoming carbon neutral in its operations and services by 2020. Work in Progress Liveability and Opportunity 10,000
Expansion of Social Housing
Show Map Location
Social housing options will be increased with the construction of up to 21 dwellings suitable for the elderly or those with a disability. Work in Progress Liveability and Opportunity 9,446
Holder Early Childhood Centre
Show Map Location
This project will deliver a new early childhood centre in Holder to support 125 children from birth to 5 years of age. Work in Progress Liveability and Opportunity 7,189
Gungahlin – The Valley Ponds and Stormwater Harvesting Scheme
Show Map Location
This project allows for the construction of three connected ponds, and associated infrastructure on Ginninderra Creek at the corner of Gungahlin Drive and The Valley Avenue in Gungahlin. Work in Progress Liveability and Opportunity 6,500
Expansion of Social Housing – Stage 2
Show Map Location
This project provides for the construction of additional dwellings to support the implementation of Project Independence to address the housing needs of people with disability. Work in Progress Liveability and Opportunity 5,000
ESA Station Upgrade and Relocation – Phase 1 Due Diligence and Forward Design
Show Map Location
This project initiated due diligence and forward design work to ensure that the ACT's emergency services facilities are appropriately located to provide timely ambulance and fire response services to the community. Work in Progress Liveability and Opportunity 3,961
Fitters’ Workshop Kingston Foreshore
Show Map Location
This project involves refurbishment of the South Offices of the former Transport Depot on Wentworth Avenue as temporary accommodation for a community print and lithographic studio. Work in Progress Liveability and Opportunity 3,900
Street Theatre Extension
Show Map Location
The extension of the Street Theatre will provide suitable accommodation for theatre administrative functions. Work in Progress Liveability and Opportunity 3,180
Canberra Theatre Centre Upgrades
Show Map Location
This project involves upgrading the Canberra Theatre Centre to ensure that the Centre can continue to meet hirer, audience and community requirements as the region’s main performing arts centre. Work in Progress Liveability and Opportunity 3,109
Disability Dual Occupancy Housing
Show Map Location
Three dual occupancy properties are being constructed for clients who, because of the complexity of their disability, need to live alone (single tenancy). Work in Progress Liveability and Opportunity 2,948
Tuggeranong Arts Centre Improvements
Show Map Location
This project involves increasing floor space, addressing occupational health and safety issues and improving the circulation and functionality of the centre. Works undertaken will provide a new foyer, first floor gallery, administration space, artists studios and dance theatre. Work in Progress Liveability and Opportunity 2,000
ESA Station Upgrade and Relocation – Phase 2 Due Diligence
Show Map Location
This project wil deliver further due diligence and Final Sketch Plan designs for additional future sites for new and upgraded emergency services facilities. Work in Progress Liveability and Opportunity 1,650
Upgrade of Community Facilities and Childcare Centre Improvements
Show Map Location
This project upgrades and refurbishes community facilities, including youth centres, childcare centres, neighbourhood halls and community rooms. The project will refurbish eight childcare centres to meet National Quality Standards and provide additional childcare places. Work in Progress Liveability and Opportunity 1,600
Security Improvement Program for Elderly Public Housing Tenants
Show Map Location
This project provides additional security measures to improve the safety and security of elderly public housing tenants living in older persons' accommodation and multi-unit complexes. Work in Progress Liveability and Opportunity 1,500
Flynn Regional Community Hub Stage 2
Show Map Location
This project provided for the completion of the refurbishment of the former school building as a Regional Community Hub in May 2013. Work in Progress Liveability and Opportunity 1,200
Childcare Centre Improvements
Show Map Location
This program involves upgrades and refurbishment work at ACT Government owned early childhood centres and child care centres. Work in Progress Liveability and Opportunity 900
Replacement of Canberra Seniors Centre (Design)
Show Map Location
This project involves a study into the relocation of the Canberra Seniors Centre located in Turner and, as far as practicable, commence site selection, preliminary design and sketch plans. Work in Progress Liveability and Opportunity 650
Alexander Maconochie Centre – Crisis Support Unit Upgrade
Show Map Location
This project improves the design and functionality of the Crisis Support Unit at the Alexander Maconochie Centre to provide a safer environment for detainees and staff. Work in Progress Liveability and Opportunity 588
Woden/Weston Creek Community Hub (Feasibility and Forward Design)
Show Map Location
This feasibility study and forward design will investigate options for a Community Hub in the Woden/Weston Creek region to accommodate a community centre, a childcare centre and a seniors centre Work in Progress Liveability and Opportunity 550
Civic Childcare Centre (Feasibility)
Show Map Location
This feasibility study will investigate options for redeveloping the Civic Childcare Centre located on Marcus Clarke Street in City West, or relocating the Centre to an alternative site in or adjacent to the City Work in Progress Liveability and Opportunity 350
Belconnen Arts Centre Stage 2 (Feasibility and Forward Design)
Show Map Location
This project includes a feasibility study and forward design to investigate options for the construction of stage 2 of the Belconnen Arts Centre. Work in Progress Liveability and Opportunity 300

Top of page

Urban Renewal

Project Title Description Type Theme Total Project Value ($'000)
Capital Metro (Design)
Show Map Location
This project will deliver preliminary design studies and a delivery strategy to progress the Light Rail Transit corridor between Gungahlin and the City, via Flemington Road and Northbourne Avenue, as well as identifying any necessary preparatory works. New Work Urban Renewal 5,000
National Arboretum Canberra – Water Security
Show Map Location
This project is for the design and construction of irrigation infrastructure at the National Arboretum Canberra to provide automated water security to turf, plants and forests. New Work Urban Renewal 3,580
Woden Bus Interchange Redevelopment (Finalisation of Design)
Show Map Location
This project provides for the design of a new integrated and modern bus interchange at Woden which will improve public safety and public transport infrastructure and support urban redevelopment opportunities in Woden. New Work Urban Renewal 2,500
Transport for Canberra – Bus Stop Upgrades to Disability Standards Stage 3
Show Map Location
This project continues the improvement of bus stops and shelters across the Territory to achieve compliance with the Disability Discrimination Act 1992 standards. It aims to assist people with a disability by making public transport infrastructure more accessible. New Work Urban Renewal 2,000
Ashley Drive – Stage 2 (Design)
Show Map Location
This project will allow for the forward design for the duplication of Ashley Drive between Erindale Drive and Johnson Drive. The duplication would seek to address traffic congestion and delays at major intersections along the length of Ashley Drive and provide improved shared path access and on road cycling. New Work Urban Renewal 1,575
ACT Light Rail Master Plan (Feasibility)
Show Map Location
This project is for a master planning process which will investigate and identify issues for a future Canberra-wide light rail and assess its feasibility. The project will also guide strategic transport and land use planning associated with any future expansion of light rail and identify network issues. New Work Urban Renewal 1,400
Molonglo 2 – Water Quality Control Ponds, Sewers and Cyclepath (Design)
Show Map Location
This project is to undertake the design of water quality control ponds, sewers and a cycle path to enable infrastructure servicing of the proposed Molonglo Group Centre, which includes commercial and community releases. New Work Urban Renewal 1,000
Throsby – Access Road (Design)
Show Map Location
This project provides for the design of a road into the new suburb of Throsby from Horse Park Drive to facilitate land releases and development. New Work Urban Renewal 1,000
Coppins Crossing Road and William Hovell Drive Intersection and Road Upgrades (Feasibility)
Show Map Location
This feasibility study will include options for the upgrade of Coppins Crossing Road and related intersections, which will be required to accommodate increased traffic as a result of current and future land development in the Molonglo Valley. New Work Urban Renewal 900
City to the Lake Assessment (Feasibility)
Show Map Location
This project will assess the requirements and costs of relocating existing roads, stormwater, sewers, water mains and other services as proposed as part of the City to the Lake project. This will include modifications to Parkes Way and West Basin foreshore, to inform future infrastructure investment in the City Centre and progressing the Australia Forum proposal to investment ready status. New Work Urban Renewal 800
Kenny – Floodways, Road Access and Basins (Design)
Show Map Location
This project includes the design of two floodways and stormwater retardation basins to mitigate stormwater flows through Kenny. It will also provide a floodway that will service part of Throsby. New Work Urban Renewal 500
Molonglo 2 – East-West Arterial Road and Services Extension to Cravens Creek (Design)
Show Map Location
This project facilitates a feasibility study for an East West Arterial road in Molonglo 2 which is required to allow road and service connections to the new suburb of Denman Prospect. New Work Urban Renewal 500
Barry Drive – Bridge Strengthening on Commercial Routes
Show Map Location
This project will upgrade the bridge of Barry Drive over Sullivans Creek to enable it to carry vehicles up to unrestricted B-double capacity and to be compliant with the relevant load ratings. This bridge has been identified as a priority on the proposed expanded ACT Higher Mass Limits network and the upgrade is being jointly funded by the Commonwealth Government. New Work Urban Renewal 479
Molonglo 3 – Hydraulic Services Concept Masterplanning (Feasibility)
Show Map Location
This masterplanning process is to investigate options for water supply, sewers, stormwater management including water quality control ponds and wetlands to support development in north Molonglo, which is identified for future release. New Work Urban Renewal 450
Lanyon Heritage Precinct Community Access Roads
Show Map Location
This initiative implements Stage 1 of a major upgrade of roads within the Lanyon Heritage Precinct, so as to facilitate community access to, and within, the precinct. New Work Urban Renewal 400
Local Shopping Centre Upgrade Program (Design)
Show Map Location
This project will deliver forward designs for refurbishing local shopping centres across the Territory. The proposed refurbishments will include paving, seating, parking arrangements, lighting, and improvements to accessibility to ensure the centres meet current Australian Standards and provide safe public spaces. New Work Urban Renewal 360
Molonglo 3 – Major Electrical Infrastructure Relocation (Feasibility)
Show Map Location
This project is to investigate the options and cost of relocating existing 132kV high voltage overhead electrical transmission power lines that currently cross proposed land release areas in north Molonglo. New Work Urban Renewal 350
West Belconnen – Stormwater, Hydraulic and Utility Services (Feasibility)
Show Map Location
The Government’s land release program includes the development of land in West Belconnen. This project is to investigate the options for servicing this proposed development with water, sewer, stormwater and other services. New Work Urban Renewal 350
West Belconnen – Roads and Traffic (Feasibility)
Show Map Location
This initiative provides for the investigation of the potential impact of land release in West Belconnen on the existing transport network and examining options to address issues identified. New Work Urban Renewal 325
Isabella Weir Spillway Upgrades (Feasibility)
Show Map Location
This project provides for an assessment of the scope of works needed to increase the capacity of Isabella Weir to reduce the risk of flooding during extreme storm events and development of flood management response measures. New Work Urban Renewal 300
Molonglo 3 – Preliminary Geotechnical Investigation (Feasibility)
Show Map Location
This project will provide for investigation of the soils and substrata in north Molonglo, which is identified for future release. New Work Urban Renewal 275
Co-location of Racing Codes Study (Feasibility)
Show Map Location
This project will involve the Government working collaboratively with the ACT racing industry to conduct an investigation and cost benefit analysis of co-locating harness, thoroughbred and greyhound racing at a single site. New Work Urban Renewal 250
Drinking Fountains and Refill Stations
Show Map Location
This project is for the installation of thirty new drinking fountains in key public locations across Canberra including town centres, sporting fields, hospitals and schools, and provides drinking and refill stations at public events. New Work Urban Renewal 240
Kingston – Wentworth Avenue Pavement Rehabilitation Stage 2 (Design)
Show Map Location
This project is for the forward design and cost estimation for the second stage of pavement rehabilitation along Wentworth Avenue, between Dawes Street and Telopea Park for the city bound lanes. New Work Urban Renewal 200
Transport for Canberra – Real Time Passenger Information System – Passenger Information Displays and Signage
Show Map Location
This project will install passenger information displays at selected bus stations and major stops for the Real Time Passenger Information System (NXTBUS). This system will enable improved planning of trips and connections by passengers and also provides service information that will contribute to public transport planning. New Work Urban Renewal 190
Transport for Canberra – Park and Ride Facilities (Design)
Show Map Location
This project facilitates the design of Park and Ride and Bike and Ride facilities at Erindale, Wanniassa, Weston Creek and Molonglo. The facilities extend the catchment of major public transport routes and aim to provide an effective and efficient method of accessing town centres using private vehicles and public transport. New Work Urban Renewal 120
Kingston Foreshore – Structured Carpark (Feasibility)
Show Map Location
This project allows for investigation of the feasibility and delivery options for a multi level car park in the Kingston Foreshore area. New Work Urban Renewal 100
Stormwater Augmentation (Feasibility)
Show Map Location
This feasibility study will identify options to augment the existing stormwater network in Duffy, Deakin, Ainslie and Campbell to reduce the risk of flooding of private residences and property. New Work Urban Renewal 100
Weston Creek – Group Centre Parking (Design)
Show Map Location
This project will alleviate pressure on the existing parking at the group centre and address future demand, with a portion of parking to be allocated as Park and Ride facilities. Forward design is to be undertaken for the provision of eighty additional car parking spaces and pedestrian crossings at two sites in Weston Creek, including Liardet Street and Dillon Close. New Work Urban Renewal 48
Transport for Canberra – Majura Parkway
Show Map Location
This project will deliver improved freight and commuter traffic flows and safety along Majura Parkway by ultimately linking the Monaro Highway to the Federal Highway. Work in Progress Urban Renewal 288,000
John Gorton Drive Extension to Molonglo 2 and Group Centre
Show Map Location
This project is delivering the extension of John Gorton Drive to allow arterial road access to the next development area in Molonglo and to the proposed group centre. Work in Progress Urban Renewal 65,050
Constitution Avenue
Show Map Location
This project provides for the delivery of infrastructure upgrades to Constitution Avenue, including new road carriageways and public realm improvements. Work in Progress Urban Renewal 42,000
North Weston – Road Intersection Reconstruction
Show Map Location
This project involves the construction of three signalised intersections in North Weston to support expected additional traffic associated with new developments in Molonglo and North Weston. Work in Progress Urban Renewal 28,500
Horse Park Drive Extension to Moncrieff Group Centre
Show Map Location
The construction of the Horse Park Drive Extension commenced in July 2012 and will deliver a road extension from Amaroo to the Moncrieff Group Centre. Work in Progress Urban Renewal 24,000
Casey – Clarrie Hermes Drive Extension to the Barton Highway
Show Map Location
This project extends Clarrie Hermes Drive from Kelleway Avenue to the Barton Highway enabling direct traffic access to the suburb of Casey. Work in Progress Urban Renewal 20,460
Mugga Lane – Land Fill Extension – Stage 5
Show Map Location
This project provides for the construction of the first four cells of the Mugga Lane Stage 5 landfill extension and associated works. Work in Progress Urban Renewal 19,850
Molonglo 2 – Uriarra Road Upgrade
Show Map Location
This project provides for the construction of a road linking John Gorton Drive (North Wright) and Uriarra Road, including the construction of three intersections off Uriarra Road. Work in Progress Urban Renewal 17,000
Transport for Canberra – Parkes Way Widening
Show Map Location
This project will improve traffic flows by widening Parkes Way between the Glenloch Interchange and the Acton tunnel. Work in Progress Urban Renewal 14,700
Molonglo 2 Sewer and Pedestrian Bridge over Molonglo River
Show Map Location
This project provides for the design and construction of a combined sewer and pedestrian bridge 280 metres in length crossing the Molonglo River. Work in Progress Urban Renewal 12,400
Horse Park Drive Extension from Burrumarra Avenue to Mirrabei Drive
Show Map Location
This project involves construction of a 1.3 kilometre extension of Horse Park Drive from Burrumarra Avenue to Mirrabei Drive in North Gungahlin. Work in Progress Urban Renewal 11,500
Molonglo 2 – Water Supply, Trunk Sewer and Stormwater Infrastructure – Stage 1
Show Map Location
This project is to deliver hydraulic infrastructure to facilitate the Molonglo Stage 2 land release, including the design and construction of stormwater drainage infrastructure, trunk water supply and sewer mains. Work in Progress Urban Renewal 10,000
Transport for Canberra – Canberra Avenue Bus Priority Measures
Show Map Location
This project will identify the most effective bus priority options for the Canberra Avenue corridor from Fyshwick east to Hume Circle, and identify long and short-term solutions to improve transit on this transport corridor. Work in Progress Urban Renewal 8,200
Shopping Centre Upgrade Program – Red Hill and Lyons
Show Map Location
This project includes the forward design and construction of upgrades to Red Hill and Lyons Shopping Centres, including pedestrian safety and crossings, parking, repaving, traffic flow measures, new lighting, street furniture, landscape treatments and public artwork. Work in Progress Urban Renewal 8,000
Inner North Stormwater Reticulation Network
Show Map Location
This project allows for a trial of the use of captured stormwater from the Flemington Road ponds and the Dickson and Lyneham ponds to replace the use of potable water. Work in Progress Urban Renewal 7,500
Public Art Scheme
Show Map Location
This scheme will assist in the commissioning and installation of major art works in all town centres. Work in Progress Urban Renewal 7,348
Government Office Accommodation and Relocation Fitout
Show Map Location
This project facilitates the consolidation of accommodation for a number of Government Directorates formed as a result of the Hawke Review and the One Government structure. Work in Progress Urban Renewal 7,170
Transport for Canberra – Cotter Road Improvements
Show Map Location
This project will upgrade infrastructure along Cotter Road to increase capacity to support planned growth in Molonglo. Works will be undertaken between the Tuggeranong Parkway and Yarra Glen. Work in Progress Urban Renewal 7,150
Ashley Drive – Stage 1
Show Map Location
This project will improve the intersection of Erindale Drive and Sternberg Crescent to reduce traffic congestion. Work in Progress Urban Renewal 7,000
Town and District Park Upgrades
Show Map Location
This project will implement improvements to a number of Town and District Parks, including Eddison Park, Black Mt Peninsula and Weston Park. Work in Progress Urban Renewal 6,150
Transport for Canberra – Walking and Cycling Infrastructure – Stage 3
Show Map Location
This program of works in progress is designed to improve cycling and walking infrastructure across the Territory through the construction of new on and off road cycle and community paths and related signage. Work in Progress Urban Renewal 5,500
Narrabundah Long Stay Park – Symonston
Show Map Location
This project is providing for the construction of 19 new mobile homes at Narrabundah Long Stay Park and its redevelopment for the ongoing security of residents. The project also involves the provision of financial assistance measures for eligible Park residents. Work in Progress Urban Renewal 5,000
Eastern Valley Way Inlet – Stage 2 Inlet and Public Realm
Show Map Location
Stage 2 of the project will complete the revitalisation of the Inlet, adjacent to the Belconnen skate park. Work in Progress Urban Renewal 4,670
Molonglo Riverside Park – Stage 1
Show Map Location
This project provides for essential infrastructure in the Molonglo River Park and fire protection for new suburbs including the protection of endangered species and communities. Work in Progress Urban Renewal 4,500
Transport for Canberra – Bus Stop Upgrades to Disability Standards – Stage 2
Show Map Location
This project provides for improvements to bus stops and shelters across the Territory to ensure compliance with the Disability Discrimination Act 1992 standards. Work in Progress Urban Renewal 4,500
Extension of the Mugga Lane Resource Management Centre Landfill Cell
Show Map Location
This project will extend the life of the current landfill to 2017 by constructing a new landfill cell within the current Mugga Land Resource Management Centre. Work in Progress Urban Renewal 4,400
ACTION – Fuel Facilities at Depots
Show Map Location
Fuelling facilities will be upgraded at Belconnen and Tuggeranong bus depots to comply with Australian Standards and environmental guidelines. Work in Progress Urban Renewal 4,383
Canberra CBD Upgrade Stage 2 – Merry-go-round and Veterans' Park
Show Map Location
This project supports the implementation of the Canberra City Action Plan 2010-2016.  Specific projects include improvements to Bunda Street from East Row to Northbourne Avenue, Veterans’ Park, Petrie Plaza and City Walk. Work in Progress Urban Renewal 4,300
Transport for Canberra – Park and Ride Facilities
Show Map Location
This project involves the construction of park and ride facilities. Work in Progress Urban Renewal 3,800
Strategic Bushfire Management Plan Version 2
Show Map Location
This project will deliver works to implement the latest version of the Strategic Bushfire Management Plan including construction and upgrade of water points, helicopter landing pads, fuel breaks, and infrastructure to facilitate grazing and prescribed burning for fuel management. Work in Progress Urban Renewal 3,798
Transport for Canberra – Woden Bus Depot Upgrade
Show Map Location
This project will enable the recommissioning of the Woden Bus Depot as a functioning satellite depot to facilitate growth in the bus service required to deliver Transport for Canberra. Work in Progress Urban Renewal 3,666
Molonglo 2 – Trunk Sewer and Stormwater Infrastructure from Holden's Creek
Show Map Location
This project provides for the final design and construction of a trunk sewer main and associated stormwater pipeline from Holden's Creek to Molonglo 2. Work in Progress Urban Renewal 3,500
Centenary Trail
Show Map Location
This project will provide a walking and cycling trail and associated reserve facilities to enhance opportunities for nature based activities. Work in Progress Urban Renewal 3,300
New Court Facilities (Design and PPP Scoping)
Show Map Location
This initiative provides for the design of a modern facility to replace the current 50 year old Supreme Court. The next stage is for the Government to investigate the possibility of entering into a Public Private Parternship Agreement, and to undertake detailed due diligence on the funding model. Work in Progress Urban Renewal 3,250
Regional Community Facilities Car Parks and Building Facades
Show Map Location
This project has provided enlarged car parks at eight regional community facility sites and facilitated improvements to disability access ramps, carpark signage, building facades, and security features on external windows. Work in Progress Urban Renewal 3,162
Mugga Lane – Rehabilitation of Old Landfill Cells
Show Map Location
This project will provide final closure and rehabilitation of closed landfill cells at Mugga Lane, in line with current environmental protection standards and requirements. Work in Progress Urban Renewal 3,100
Transport for Canberra – Belconnen to City Transitway – College Street Section
Show Map Location
This project includes the construction of bus priority measures on the Blue Rapid route along College Street and Hayden Drive, between Cooinda and Battye Streets. Work in Progress Urban Renewal 3,000
Stromlo Forest Park Planning and Infrastructure
Show Map Location
This project includes improving facilities and infrastructure at Stromlo Forest Park. Work in Progress Urban Renewal 2,800
Remediation of West Belconnen Land Fill Borrow Pit
Show Map Location
This project will establish a dedicated clean fill disposal site at the West Belconnen Landfill Facility. Work in Progress Urban Renewal 2,783
West Belconnen Resource Management Centre Rehabilitation of Landfill Cells
Show Map Location
This project will provide final closure and rehabilitation of closed landfill cells at West Belconnen, to meet environmental protection standards. Work in Progress Urban Renewal 2,550
Gungahlin to City Transit Corridor (formerly Northbourne Avenue Transitway)
Show Map Location
This project will deliver the preliminary design of a transitway along Northbourne Avenue. Work in Progress Urban Renewal 2,500
Office Accommodation
Show Map Location
This project involves the exploration of options to support the Government's objective to secure office accommodation in Civic. Work in Progress Urban Renewal 2,500
Ngunnawal Aged Care Land Release – Gold Creek
Show Map Location
This project provides road access to the Gold Creek Homestead site in Ngunnawal which has been sub-divided for aged care development and other community uses.  Work in Progress Urban Renewal 2,400
Jerrabomberra Wetlands Infrastructure Improvements
Show Map Location
This project provides for works to improve visitor amenities including improvements to the network of viewing hides, visitor information and education facilities and the construction and enhancement of wetland habitat. Work in Progress Urban Renewal 2,341
City Action Plan Stage 1 – Edinburgh Avenue Improvements
Show Map Location
This project will provide an important new access road into City West by extending Edinburgh Avenue between London Circuit and Vernon Circle. Work in Progress Urban Renewal 2,000
Transport for Canberra – Public Transport Infrastructure
Show Map Location
This project allows for the assessment of the adequacy of public transport infrastructure and implementation of measures aimed at improving and accommodating larger public transport vehicles. Work in Progress Urban Renewal 2,000
East Lake Sustainable Urban Renewal
Show Map Location
This project will provide for the continuation of the current partnership with CSIRO, thereby building on established sustainability design principles to develop innovative applications of urban sustainability.  It will also progress work on railway reconfiguration and a roads study.  Work in Progress Urban Renewal 1,720
Molonglo Valley – Finalisation of Stage 2 and Commencement of Stage 3 Planning (Feasibility)
Show Map Location
This project includes a feasibility study for the development of the concept plan for the group centre and environs for Molonglo Stage 2. Work in Progress Urban Renewal 1,570
Infill Development Infrastructure Studies (Feasibility)
Show Map Location
These studies are investigating infrastructure capacities and upgrade requirements of engineering and service infrastructure for various group centres, rural villages, transport corridors and town centre sites. These studies will inform infill development and redevelopment options to support urban intensification. Work in Progress Urban Renewal 1,500
Remediation of Fuel Storage Facilities
Show Map Location
This project will undertake the remediation of non-operational fuel storage tanks at ACT Government sites. Work in Progress Urban Renewal 1,500
Transport for Canberra – Barton Bus Station
Show Map Location
This project provides for the construction of bus stops, shelters and associated facilities on National Circuit between Kings Avenue and Bligh Street which will provide a consolidated bus stop location in the Parliamentary Triangle. Work in Progress Urban Renewal 1,500
Molonglo Valley – Implementation of the Commitments in the NES Plan
Show Map Location
This project will allow for the continued implementation of commitments contained in the Molonglo Valley Plan for the Protection of Matters of National Environmental Significance (NES), an agreement made with the Commonwealth Government. Work in Progress Urban Renewal 1,400
Urban Development Sequence for Affordable Housing (Feasibility)
Show Map Location
This project is supporting the Affordable Housing Action Plan through planning and infrastructure investigations in new Greenfield areas which will provide for long-term planning options regarding land supply. Work in Progress Urban Renewal 1,400
Barton – Intersection Upgrades – Darling Street, Section 22
Show Map Location
The project provides for the upgrade of the intersection of National Circuit and Darling Street, Barton, to facilitate land release on Darling Street. Work in Progress Urban Renewal 1,000
Gungahlin Town Centre Roads (Design)
Show Map Location
This project provides for the detailed design of the road and street network in the eastern Town Centre. Work in Progress Urban Renewal 1,000
Molonglo 2 – Water Supply, Trunk Sewer and Stormwater Infrastructure – Stage 2 (Design)
Show Map Location
This project continues the design of hydraulic infrastructure, including a water quality control pond, stormwater infrastructure, trunk water, sewer mains and pumping station to facilitate the release of land in Molonglo Stage 2. Work in Progress Urban Renewal 1,000
Playground Designs and Safety Upgrades
Show Map Location
This project will provide for the design and renewal of playgrounds in a number of district parks across the ACT including Yerrabi Pond District Park, John Knight Memorial Park and Kambah District Park. Work in Progress Urban Renewal 1,000
Upgrade of Commonwealth Park (Floriade)
Show Map Location
This project includes work undertaken at Commonwealth Park to improve the site for the staging of Floriade includes additional pathways, improved electrical services, improved stormwater services and safety and aesthetic enhancements. Work in Progress Urban Renewal 983
Kenny Planning and Design Framework and Kenny and Throsby Environmental Assessments
Show Map Location
This project is supporting the establishment of the new suburbs of Kenny and Throsby through a range of preliminary activities including preparing a planning and design framework and undertaking heritage subsurface investigations for Kenny. Work in Progress Urban Renewal 900
Continuation of Urban Infill Program (Feasibility)
Show Map Location
This project provides for continued investigations into suitable infill sites for urban development to meet the Government’s objectives of a compact city. Work in Progress Urban Renewal 764
Revitalisation of Civic and Braddon (Design)
Show Map Location
This project involves the design of improvements to public amenity in North Canberra including public realm improvements in Braddon, lighting and footpaths in Allara Street and Akuna Street in the City, and landscaping connections from Northbourne Avenue to City Hill. Work in Progress Urban Renewal 750
Upgrade to Public Toilet Facilities
Show Map Location
This will provide for the refurbishment of public toilet facilities at priority locations including Dickson and Kambah Village Shops. Work in Progress Urban Renewal 750
New Southern Cemetery Design
Show Map Location
This project provides for the design of landscaping, major infrastructure and associated building works for a proposed new cemetery and crematorium. Work in Progress Urban Renewal 727
Conference Centre and Parkes Room Refurbishment
Show Map Location
This project will upgrade the Conference Centre and Parkes Room at Exhibition Park in Canberra. Work in Progress Urban Renewal 605
Upgrades Furniture and Bins in Parks and Shopping Centres Across the City
Show Map Location
This project upgrades furniture and bins in parks and shopping centres across the City, including Hawker, Kingston, Manuka, Jamison and Mawson. In addition, log bollards and barriers will be installed and refurbished around Lake Tuggeranong, Fadden Pines, Tuggeranong Parkway and District Parks and gravel car parks improved at Alexandrina Drive Yarralumla, Molonglo Reach Latrobe Park and other district parks and hill top reserves. Work in Progress Urban Renewal 600
Gungahlin – Recycling Drop Off Centre
Show Map Location
Construction is underway on a Recycling Drop Off Centre at Gungahlin to enable residents and small businesses to recycle items including paper, cardboard, glass and plastic. Work in Progress Urban Renewal 550
Transport for Canberra – City Area Bus Layover Facility (Design) – ESDD Planning
Show Map Location
This initiative provides for the examination of design options for a City Area Bus Layover Facility located on Block 8 Section 25 Turner. Work in Progress Urban Renewal 500
Woden Bus Interchange Redevelopment
Show Map Location
This project is delivering the design of new bus interchange facilities for Woden intended to enhance the integration of the bus station with new retail and personal services businesses. This is expected to include an internal bus lounge, public toilets, improved security, pedestrian and bicycle connections between the bus station and other town centre destinations and additional parking. Work in Progress Urban Renewal 500
Woden Stormwater Infrastructure (Design)
Show Map Location
This project involves the design of new infrastructure in Woden and preparation of statutory approvals and development plans to support the redevelopment of land in the Woden Town Centre. Work in Progress Urban Renewal 460
Kenny Contamination Remediation
Show Map Location
The project involves the remediation of a number of contaminated sites within the proposed suburb of Kenny to enable proposed development to proceed. Work in Progress Urban Renewal 400
The Valley Avenue Extension to Gundaroo Drive (Design)
Show Map Location
This project is for the design of the western extension of The Valley Avenue (Gungahlin Town Centre) and the realignment of The Valley Avenue from its current intersection with Gungahlin Drive to a new intersection with Gundaroo Drive. Work in Progress Urban Renewal 400
Transport for Canberra – City Path Lighting
Show Map Location
This project will increase lighting along community shared paths into the City. Work in Progress Urban Renewal 400
Woden Valley Stormwater Retardation Basins (Design)
Show Map Location
This project is delivering the design of two stormwater retardation basins (and possibly wetlands), in the Woden Valley adjacent to Yarralumla Creek. One of the basins is proposed for co-location with existing playing fields and the second is likely to be constructed in urban open space in Mawson. Work in Progress Urban Renewal 400
Transport for Canberra – Erindale Bus Station (Design)
Show Map Location
This provides for the design of a bus station in the Erindale Group Centre, including road works to better accommodate buses and improve bus stops and shelters. Work in Progress Urban Renewal 350
Inner North – Off Leash Dog Park
Show Map Location
This project involves the design and construction of a fenced off leash dog park in the Inner North of Canberra to provide access to social activities, exercise and training opportunities for dogs and their owners. Work in Progress Urban Renewal 300
Molonglo – North-South Arterial Road Bridge and Pedestrian Bridge (Feasibility)
Show Map Location
This project involves the exploration of solutions for improved traffic flows in Molonglo, including the North-South Arterial Road (John Gorton Drive) bridge options and the combined pedestrian/cyclist and sewer crossings. Work in Progress Urban Renewal 300
Mugga Lane – Clean Fill Transfer Site – Technical Investigation (Design)
Show Map Location
This project involves technical investigations and forward design of the Mugga Quarry site to determine its suitability as a clean fill disposal and exchange site. Work in Progress Urban Renewal 300
Transport for Canberra – Park and Ride Facilities – ESDD Planning
Show Map Location
This project provides for preliminary concept designs to deliver new park and ride and bike and ride facilities across Canberra. Work in Progress Urban Renewal 300
East Lake – Planning and Design Framework Implementation (Feasibility)
Show Map Location
This project provides for further environmental and technical investigations to inform and facilitate a variation to the Territory Plan for East Lake. Work in Progress Urban Renewal 250
Transport for Canberra – West Belconnen Transit Stops and Terminus Improvements (Design)
Show Map Location
This project provides for the design of improved bus stops for the Blue Rapid service along Southern Cross Drive to the Kippax Group Centre and improved bus termini in West Belconnen. Work in Progress Urban Renewal 250
Wright Outer Asset Protection Zone – Stromlo Forest Park
Show Map Location
This project includes progressing work on the design of a 350 metre wide Outer Asset Protection Zone on the eastern and northern borders of Stromlo Forest Park. Work in Progress Urban Renewal 250
ACTION – Third Major Bus Depot (Feasibility)
Show Map Location
This study is assessing options and providing a preliminary design for a third major bus depot to be located in the Gungahlin/Mitchell area. Work in Progress Urban Renewal 201
ACT Strategic Cycle Network Plan
Show Map Location
This project will improve the cycling and walking infrastructure through studies into the most appropriate placement of on and off road cycle and community paths and related signage. Work in Progress Urban Renewal 200
Kingston Foreshore Parking (Design)
Show Map Location
This project will investigate options for parking within the Kingston Foreshore Cultural Precinct. Work in Progress Urban Renewal 200
Molonglo – Path Connections from John Gorton Drive to Molonglo Path Network (Design)
Show Map Location
This project involves the design of pedestrian and cycle path connections between John Gorton Drive and the existing off-road path network within Molonglo. Work in Progress Urban Renewal 200
Molonglo Leisure Centre (Feasibility)
Show Map Location
This project is for a feasibility study to investigate the most appropriate type of leisure facility to meet the needs of the Molonglo community. The consultation phase of the project has concluded. Work in Progress Urban Renewal 200
Molonglo Valley – Environmental Impact Statement for Deferred Area (Feasibility)
Show Map Location
This project is assisting with the identification of land for future release within the Molonglo Valley, including a possible Environmental Impact Statement. Work is also being undertaken to finalise the bushfire protection zones along the western boundary of Molonglo Stage 2. Work in Progress Urban Renewal 200
Stromlo Forest Park Soil Conservation Works
Show Map Location
This project includes continuing work on soil conservation at Stromlo Forest Park, which involves the stabilisation of cycling and equestrian infrastructure to mitigate deterioration from usage and runoff from weather events. Work in Progress Urban Renewal 200

Top of page